Machine Studies

Draft Schedule for Run01-1, 2012

January 24th 0800 – January 31st 0800

Time

Descriptions

Studiers

SR Status


Monday, Jan. 23 (pre-studies)



0700-0800

HP check of RF at Zone E/F door

Vacca

Access Zone E

0800-0815

Switch back to Pump 525 from 526 (P.S. set to 0 -- not off) WRQ #30007

Theres

No beam

0900-2400

Set-up SR and RF conditioning with beam

OPS/Xiao/ Schroeder

Stored beam & injection

1600-1800

35BM pinhole camera setup for machine start up

Yang

Stored beam & injection


Tuesday, January 24, 2012



0000-0800

RF conditioning with beam (continued)

OPS

Stored beam & injection

0800-1200

BPLD validations

Bui

Stored beam & injection

1200-1400

x-ray bpm checkout

Hahne

Stored beam & occ. injection

1200-1400

Check booster beam after B:IK and B:SD changes, and establish new booster ramp timing to allow more tuning range

Moved to Thursday

Yao

Occ. Injection possible

1400-2200

Initial bpm system checkout / commissioning (impacted by SR cond).

Decker

Stored beam & occ. injection

2200-2400

Orbit Recovery(impacted by SR cond)

Xiao

Stored beam & injection


Wednesday, January 25, 2012



0000-0400

Orbit recovery

Xiao

Stored beam & injection

0400-1600

RF Conditioning with beam (continued)

OPS


1400-2100

Continue orbit recovery/Lattice set-up for 24 singlets

Sajaev

Stored beam & inj.

2100-2200

Steer 13-ID and orbit in moved sectors 6 and 29

Sajaev

Stored beam & injection

2200-2300

Scraper operating position determination (low current)

Sajaev/ Harkay/Boon

Stored beam & inj.

2300-2400

S37 scraper conditioning to 100mA, 24 bunches

Harkay/Boon

Stored beam & injection

2200-2400

Intermediate bpm checkout

Decker

Stored beam & inj.


Thursday, January 26, 2012



0000-0500

Intermediate bpm checkout

Decker

Stored beam & inj.

0000-0500

S37 scraper conditioning to 100mA, 24 bunches (continued)

Harkay/Boon

Stored beam & injection

0500-0600

Prepare for PAR access

OPS

No injection

0600-1330

Replace PAR P2IK thyratron

Hillman

No Injector

0800-1000

Calibrate bypass valve positioner for system P-SR-12

Swetin

No Beam

0800-1000

Measure PAR RF-12 cavity tuning characteristics

Yao, Smith

Limited Injection

0830-1030

redress cables that are restricting access to phase read-back calibration adjustments at L2, L3, and L4

Jefferson

No Linac beam

0800-1200

PSS shutter checkouts

SI group

No Beam

0800-1400

Swap klystron for RF test stand

RF group

No Beam

1400-1800

29-ID radiation shield verification/ Conditioning Moved to Friday @10:00

Yang/Decker/ Ramanathan

Stored beam & occ. Inj.

1400-1600

Check booster beam after B:IK and B:SD changes, and establish new booster ramp timing to allow more tuning range

Yao

Occ. inj. possible

1700-1800

Setup P0 feedback system for 24 singlet lattice

Yao

Stored beam & injection

1800-2400

Develop and test tune slope measurement script (tune vs. I)

Sajaev/Harkay/Boon

Stored beam & Inj.


Friday, January 27, 2012



0000-0600

OPEN



0600-0800

Swap out the SR Converter Interface board in sector 32 cabinet 3

Puttkammer

No SR beam

0700-0800

Swap out SR converter S11AQ1

Puttkammer

No SR beam

0800-1000

Measure chromaticity of Booster 132nm lattice (SR RF frequency scan)

Yao

No SR beam

1000-1400

Store 100mA, 324 singlets-- 29-ID radiation shield verification/conditioning

Yang/Decker/ Ramanathan

Stored beam

1000-1400

Booster 92nm lattice study (will inject into SR for verification)

Yao/Sereno

Stored beam & injection





1400-1800

29-ID hard bpm studies

Yang/Decker

Stored beam & inj.

1800-2200

BPM data acquisition test

Decker/Hahne/Bui/Vendor

Stored beam & inj.

2200-2400

XBPM data collection

Hahne

Stored beam & inj.


Saturday, January 28, 2012



0000-0200

XBPM data collection (continued)

Hahne

Stored beam & inj.

0200-0700

Open



0700-1300

SCU0 aperature scan studies (low current – few mA) scan 4-ID & 6-ID

Harkay/Boon

Stored beam & inj.

1300-1700

29-ID hard xbpm studies

Yang Decker

Stored beam & inj.

1700-2300

CPU set-upCancelled

Xaio


2300-2400

Top up verification

OPS

Stored beam & injection

1700-2400

Orbit recovery

Xiao

Stored beam & inj.


Sunday, January 29, 2012



0000-0700

Top-up verification Moved to Monday

OPS

Stored beam & inj.

0000-0800

Orbit recovery

Xiao

Stored beam & inj.

0800-1200

37-BM steering and vertical pinger vs. S37 scraper scrubbing with synchrotron radiation

Harkay/Boon

Stored beam & inj.

1200-2000

29-ID hard xbpm studies

Yang/Decker

Stored beam & inj.

2000-2400

CPU set-up

Xaio

Stored beam & inj.


Monday, January 30, 2012



0000-0200

CPU set-up (continued)

Xaio

Stored beam & inj.

0200-0600

4NLSS lattice setup (continued)

Sajaev

Stored beam & inj.

0600-1000

Collect XBPM data

Hahne

Stored beam & inj.

1000-1400

Test SR accumulation limit with different fill patterns (will not exceed 100mA)Canceled

Yao

Stored beam & inj.

1000-1400

Top-up Verification

OPS

Stored beam & inj.

1400-1600

S35BM pinhole camera setup for user run

Yang

Stored beam & inj.

1600-1800

35-ID bunch purity monitor set-up

Yang

Stored beam & inj.

1800-2200

Final BPM checkout

Decker

Stored beam & inj.

2200-2400

SR injection studies

Sajaev

Stored beam & inj.


Tuesday, January 31, 2012



0000-0200

SR injection studies (continued)

Sajaev

Stored beam & inj.

0200-0600

Final SR setup

Sajaev

Stored beam & inj.

0630-0800

Prepare for user Operations (24 singlets – Top-Up)

Ops

Stored Beam & Injection