Machine Studies
Draft Schedule for Run01-1, 2012
January 24th 0800 – January 31st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, Jan. 23 (pre-studies) |
|
|
0700-0800 |
HP check of RF at Zone E/F door |
Vacca |
Access Zone E |
0800-0815 |
Switch back to Pump 525 from 526 (P.S. set to 0 -- not off) WRQ #30007 |
Theres |
No beam |
0900-2400 |
Set-up SR and RF conditioning with beam |
OPS/Xiao/ Schroeder |
Stored beam & injection |
1600-1800 |
35BM pinhole camera setup for machine start up |
Yang |
Stored beam & injection |
|
Tuesday, January 24, 2012 |
|
|
0000-0800 |
RF conditioning with beam (continued) |
OPS |
Stored beam & injection |
0800-1200 |
BPLD validations |
Bui |
Stored beam & injection |
1200-1400 |
|
Hahne |
Stored beam & occ. injection |
1200-1400 |
Moved to Thursday |
Yao |
Occ. Injection possible |
1400-2200 |
Initial bpm system checkout / commissioning (impacted by SR cond). |
Decker |
Stored beam & occ. injection |
2200-2400 |
Orbit Recovery(impacted by SR cond) |
Xiao |
Stored beam & injection |
|
Wednesday, January 25, 2012 |
|
|
0000-0400 |
Orbit recovery |
Xiao |
Stored beam & injection |
0400-1600 |
RF Conditioning with beam (continued) |
OPS |
|
1400-2100 |
Continue orbit recovery/Lattice set-up for 24 singlets |
Sajaev |
Stored beam & inj. |
2100-2200 |
Steer 13-ID and orbit in moved sectors 6 and 29 |
Sajaev |
Stored beam & injection |
2200-2300 |
Scraper operating position determination (low current) |
Sajaev/ Harkay/Boon |
Stored beam & inj. |
2300-2400 |
S37 scraper conditioning to 100mA, 24 bunches |
Harkay/Boon |
Stored beam & injection |
|
|
Decker |
Stored beam & inj. |
|
Thursday, January 26, 2012 |
|
|
|
|
Decker |
Stored beam & inj. |
0000-0500 |
S37 scraper conditioning to 100mA, 24 bunches (continued) |
Harkay/Boon |
Stored beam & injection |
0500-0600 |
Prepare for PAR access |
OPS |
No injection |
0600-1330 |
Replace PAR P2IK thyratron |
Hillman |
No Injector |
0800-1000 |
Calibrate bypass valve positioner for system P-SR-12 |
Swetin |
No Beam |
0800-1000 |
Measure PAR RF-12 cavity tuning characteristics |
Yao, Smith |
Limited Injection |
0830-1030 |
redress cables that are restricting access to phase read-back calibration adjustments at L2, L3, and L4 |
Jefferson |
No Linac beam |
0800-1200 |
PSS shutter checkouts |
SI group |
No Beam |
0800-1400 |
Swap klystron for RF test stand |
RF group |
No Beam |
1400-1800 |
|
Yang/Decker/ Ramanathan |
Stored beam & occ. Inj. |
1400-1600 |
Check booster beam after B:IK and B:SD changes, and establish new booster ramp timing to allow more tuning range |
Yao |
Occ. inj. possible |
1700-1800 |
Setup P0 feedback system for 24 singlet lattice |
Yao |
Stored beam & injection |
1800-2400 |
Develop and test tune slope measurement script (tune vs. I) |
Sajaev/Harkay/Boon |
Stored beam & Inj. |
|
Friday, January 27, 2012 |
|
|
0000-0600 |
OPEN |
|
|
0600-0800 |
Swap out the SR Converter Interface board in sector 32 cabinet 3 |
Puttkammer |
No SR beam |
0700-0800 |
Swap out SR converter S11AQ1 |
Puttkammer |
No SR beam |
0800-1000 |
Measure chromaticity of Booster 132nm lattice (SR RF frequency scan) |
Yao |
No SR beam |
1000-1400 |
Store 100mA, 324 singlets-- 29-ID radiation shield verification/conditioning |
Yang/Decker/ Ramanathan |
Stored beam |
1000-1400 |
Booster 92nm lattice study (will inject into SR for verification) |
Yao/Sereno |
Stored beam & injection |
|
|
|
|
1400-1800 |
29-ID hard bpm studies |
Yang/Decker |
Stored beam & inj. |
1800-2200 |
BPM data acquisition test |
Decker/Hahne/Bui/Vendor |
Stored beam & inj. |
2200-2400 |
XBPM data collection |
Hahne |
Stored beam & inj. |
|
Saturday, January 28, 2012 |
|
|
0000-0200 |
XBPM data collection (continued) |
Hahne |
Stored beam & inj. |
0200-0700 |
Open |
|
|
0700-1300 |
SCU0 aperature scan studies (low current – few mA) scan 4-ID & 6-ID |
Harkay/Boon |
Stored beam & inj. |
1300-1700 |
29-ID hard xbpm studies |
Yang Decker |
Stored beam & inj. |
|
|
|
|
|
|
|
|
1700-2400 |
Orbit recovery |
Xiao |
Stored beam & inj. |
|
Sunday, January 29, 2012 |
|
|
|
|
|
|
0000-0800 |
Orbit recovery |
Xiao |
Stored beam & inj. |
0800-1200 |
37-BM steering and vertical pinger vs. S37 scraper scrubbing with synchrotron radiation |
Harkay/Boon |
Stored beam & inj. |
1200-2000 |
29-ID hard xbpm studies |
Yang/Decker |
Stored beam & inj. |
2000-2400 |
CPU set-up |
Xaio |
Stored beam & inj. |
|
Monday, January 30, 2012 |
|
|
0000-0200 |
CPU set-up (continued) |
Xaio |
Stored beam & inj. |
0200-0600 |
4NLSS lattice setup (continued) |
Sajaev |
Stored beam & inj. |
0600-1000 |
Collect XBPM data |
Hahne |
Stored beam & inj. |
|
|
|
|
1000-1400 |
Top-up Verification |
OPS |
Stored beam & inj. |
1400-1600 |
S35BM pinhole camera setup for user run |
Yang |
Stored beam & inj. |
1600-1800 |
35-ID bunch purity monitor set-up |
Yang |
Stored beam & inj. |
1800-2200 |
Final BPM checkout |
Decker |
Stored beam & inj. |
2200-2400 |
SR injection studies |
Sajaev |
Stored beam & inj. |
|
Tuesday, January 31, 2012 |
|
|
0000-0200 |
SR injection studies (continued) |
Sajaev |
Stored beam & inj. |
0200-0600 |
Final SR setup |
Sajaev |
Stored beam & inj. |
0630-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |