Machine Studies
Schedule for Run01-11, 2012
April 10th 0800 – April 11th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, April 10, 2012 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-1100 |
Test Linac guns process water PVs |
Pietryla |
Limited Injection |
0900-1000 |
Install iocbramp pretrigger change |
Yao, Xu |
No Injection |
0900-1100 |
Reconnect BIV for 29ID FEEPS |
McNamara |
No Beam |
0900-1100 |
Investigate B:IK DAC dropouts |
Donley |
Limited Injection |
0900-1100 |
Move SR Sextupole test stand to S23 |
Wang |
No Beam |
0900-1100 |
Test converter start up scripts |
Fors |
No Beam |
1100-1130 |
Prepare for 150mA studies |
OPS |
No beam |
1130-1700 |
Multibunch accumulation limit (150mA) |
Yao/Harkay/ Xiao |
Stored beam & inj. |
1700-1800 |
Verify restored user operations |
OPS |
stored beam & inj. |
1800-2200 |
Optimize sextupole correction of booster low emittance lattice |
Yao |
Limited injection |
2200-2300 |
Linac Requalification |
Forth/Sutton |
Limited injection |
2300-2400 |
4NLSS - RHB work |
Sajaev |
Stored beam & inj. |
|
Wednesday, April 11, 2011 |
|
|
000-0300 |
4NLSS - RHB work (continued) |
Sajaev |
Stored beam & inj. |
0300-0645 |
Injection optimization |
Sajaev |
Stored beam & inj. |
0645-0700 |
Switch MPS hard limit back to 105mA |
Smith |
No beam |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |