Machine Studies
Schedule for Run01-5, 2012
February 27h 0800 – February 29th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, February 27, 2012 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0915 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1000 |
Reboot interleaving DSPs |
PS group |
No Injection |
0930-1030 |
RF waveguide swtich |
RF group |
No Beam |
0930-1130 |
Replace PLC analog input cards RF1/2 |
RF group |
No Beam |
0930-1230 |
Move external monitoring equipment |
Wang |
No Beam |
0930-1230 |
Troubleshoot S32A:Q5 |
Fors |
No Beam |
0930-1100 |
Repair Gespac remote reset problems |
Puttkammer |
No Beam |
1030-1230 |
Linac studies |
Pasky |
Injection available |
0930-1330 |
Troubleshoot PAR RF12 amp #1 |
RF group |
Limited Injection |
1000-1100 |
Re-position BNL bellows |
Hoyt, Survey |
Access Zone D |
0930-1000 |
Remove dosimeters |
Vacca |
Access Zone A |
1100-1330 |
Troubleshoot S24 Gespac errors |
Puttkammer |
No Beam |
1200-1300 |
Investigate noise on the S32 Cherenkov detector. possible power cycle iocs31bpm to replace the vme card. |
Brill |
No beam |
1330-1430 |
test PAR harmonic tube#1 with beam after RF group study |
Yao/Harkay |
Limited injection |
1430-1530 |
add an on/off switch to NASA/VSA drive and test tune app - parasitic |
Yao/Shang |
No impact |
1530-1730 |
Setup P0 feedback for hybrids fill |
Yao/Sajaev |
Stored beam & inj. |
1730-2130 |
Orbit switch |
Xiao |
Stored beam & inj. |
2130-2400 |
P3/P4 offset measurements |
Xiao |
Stored beam & inj. |
|
Tuesday, February 28, 2012 |
|
|
0000-0100 |
P3/P4 offset measurements (continued) |
Xiao |
Stored beam & inj. |
0100-0500 |
ID4 radiation monitor studies |
Sereno |
Stored beam & inj. |
0500-0700 |
RF tilt experiment using pinger |
Sereno/Lill |
Stored beam & inj. |
0700-1000 |
Finish remaining sectors -- PID loop tuning. |
Putnam/Erwin/Pasky |
Stored beam & inj. |
1000-1200 |
test multi-bunch accumulation limit |
Yao |
Stored beam & inj. |
1200-1600 |
Investigate longitudunal instability at low Vrf in 24s, and stabilize if possible, with cavity detuning. (S40/RF1 water temp changed @ beginning of studies) |
Harkay |
Stored beam & inj. |
1600-2000 |
Tune slope in 24, 324, and hybrid modes, 0-100 mA, using S40 or S39 scraper |
Harkay/Boon |
Stored beam & inj. |
2000-2400 |
29ID studies, 102 mA top-up, 24 bunches |
Decker/Yang |
Stored beam & inj. |
|
Wednesday, February 29, 2012 |
|
|
0000-0200 |
Investigate hybrid bunch accumulation limit |
Sajaev |
Stored beam & inj. |
0200-0630 |
Complete 4NLSS+RHB setup |
Sajaev |
Stored beam & inj. |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |