Machine Studies

Schedule for Run01-6, 2012

March 6th 0800 – March 7th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, March 06, 2012



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-1030

Test RTFB DSP card

Lenkszus

No Beam

0900-1100

Add module to iocmtime

Laird

No Beam

0900-1100

Troubleshoot S15B:H4

Wang

No Beam

0900-1100

Swap PLC analog input cards

Horan

No Beam

0900-1100

Rebalance P0 FB vertical drive amps

Yao/Gold

No Beam

0900-1200

Repair remote Gespac indication

Puttkammer

No Beam

0900-1200

Move external monitoring from S14 to S13

Wang

No Beam

0900-0930

Collect SR kicker waveforms

Schroeder

No Beam

0900-1300

Troubleshoot relay in S9 ASIE

Belcher

No Beam

0900-1300

Troubleshoot PAR RF12 amp #1

RF group

Limited Injection

1100-1300

Linac studies

Pasky

Injection available

1100-1500

Test MPS-pinger trigger hardware and run with beam dumps. Stored beam and injection the second half of the time

Yao, Lenkszus, Laird, Wang

No beam (11-13)

Stored beam & Inj. (13-15)

1500-1700

Tune Vac Chamber Water Skid PID loops (24 singlets)

Putnam, Erwin

Stored beam & occ. Inj.

1500-1700

Test stability of 24 singlet beam with simulated RF1 trip (parasitic)

Schroeder

Stored beam

1500-1700

test PAR harmonic #1

Yao, T. Smith

Limited injection

1700-2100

RF tilt measurements with SR buttons + collect snubber data

Sereno/Lill

Stored beam & injection





2100-2400

XBPM studies at 29-ID (top-up) Shutter permit needed

Decker, Yang

Stored beam & injection


Wednesday, March 07, 2012



0000-0100

XBPM studies at 29-ID (top-up) Shutter permit needed (continued)

Decker, Yang

Stored beam & injection

0100-0500

Continue 4NLSS+SPX setup

Sajaev, Chae

Stored beam & inj.

0500-0700

Accumulation limit optimization

Sajaev

Stored beam & inj.

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection