Machine Studies

Draft Schedule for Run01-7, 2012

March 13th 0800 – March 14th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, March 13, 2012



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0800-0810

Observe 9BM shutter activity

SI Group

Stored Beam & Injection

0810-0915

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0915-0930

Check for instability in hybrid with RF1 simulated trip

Schroeder

Stored beam & injection

0930-1130

Measure time difference between booster ramp current sampling and injection timing system.

Yao, Xu

No Injection

0930-1200

Inspect Zone B fast correctors

Puttkammer

No Beam

0930-1130

Linac studies

Pasky

Injection available

0930-1100

Move external monitoring from S13 to S12

Wang

No Beam

0930-1030

Take kicker waveforms at 5kv and 10kv

Schroeder

No beam

0930-1200

Troubleshoot BRH420

PS Group

No Injection

0930-1200

Troubleshoot S9 ASIE

Forrestal

No Beam

1100-1200

Test conditioning double sector PEM for changes affecting S12C:[HV]1

Soliday/Schroeder

No beam

1200-1500

MPS trip pinger test

Yao, Harkay, Dooling, Wang

Stored beam & inj.

1500-1700

Vrf scan from 7.5 - 9.5 MV, 24s. Check that beam remains stable at 100 mA (no longitudinal instability)

Harkay

Stored beam & inj.

1700-1900

tilt measurement using pinger and bpm buttons

Sereno, Lill

Stored beam & inj.

1900-2300

New GRID-XBPM test, 102mA top-up

Decker, Yang

Stored beam & inj.

2300-2400

Orbit switch to 324 singlets

Xiao

Stored beam & inj.


Wednesday, March 14, 2012



0000-0300

Orbit switch to 324 singlets

Xiao

Stored beam & inj

0300-0630

CPU studies

Xiao

Stored beam & inj

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection