Machine Studies
Draft Schedule for Run01-7, 2012
March 13th 0800 – March 14th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, March 13, 2012 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0800-0810 |
Observe 9BM shutter activity |
SI Group |
Stored Beam & Injection |
0810-0915 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0915-0930 |
Check for instability in hybrid with RF1 simulated trip |
Schroeder |
Stored beam & injection |
0930-1130 |
Measure time difference between booster ramp current sampling and injection timing system. |
Yao, Xu |
No Injection |
0930-1200 |
Inspect Zone B fast correctors |
Puttkammer |
No Beam |
0930-1130 |
Linac studies |
Pasky |
Injection available |
0930-1100 |
Move external monitoring from S13 to S12 |
Wang |
No Beam |
0930-1030 |
Take kicker waveforms at 5kv and 10kv |
Schroeder |
No beam |
0930-1200 |
Troubleshoot BRH420 |
PS Group |
No Injection |
0930-1200 |
Troubleshoot S9 ASIE |
Forrestal |
No Beam |
1100-1200 |
Test conditioning double sector PEM for changes affecting S12C:[HV]1 |
Soliday/Schroeder |
No beam |
1200-1500 |
MPS trip pinger test |
Yao, Harkay, Dooling, Wang |
Stored beam & inj. |
1500-1700 |
Vrf scan from 7.5 - 9.5 MV, 24s. Check that beam remains stable at 100 mA (no longitudinal instability) |
Harkay |
Stored beam & inj. |
1700-1900 |
tilt measurement using pinger and bpm buttons |
Sereno, Lill |
Stored beam & inj. |
1900-2300 |
New GRID-XBPM test, 102mA top-up |
Decker, Yang |
Stored beam & inj. |
2300-2400 |
Orbit switch to 324 singlets |
Xiao |
Stored beam & inj. |
|
Wednesday, March 14, 2012 |
|
|
0000-0300 |
Orbit switch to 324 singlets |
Xiao |
Stored beam & inj |
0300-0630 |
CPU studies |
Xiao |
Stored beam & inj |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |