Machine Studies
Schedule for Run01-9, 2012
March 26h 0800 – March 28th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 26, 2012 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1000 |
RF waveguide switch |
RF group |
No Beam |
0930-1030 |
Reboot Booster RF iocs |
DiMonte |
No Injection |
1000-1100 |
Linac requalification |
Christensen/Pasky |
Limited injection |
1100-1200 |
boot iocbramp to test a pretrigger PV |
Yao/Shang/Xu |
No Booster beam |
0930-1200 |
Move SR external monitoring to S11 |
Wang |
No Beam |
0930-1200 |
Investigate Par P2’s Kicker fiber repeater module |
Hillman |
No Injection |
1000-1130 |
Replace S24 linear encoders |
Grimmer |
Access Zone D |
1200-1600 |
Tune PID loops for Vac Chamber water skids and PW-RF1 |
Swetin/Erwin |
Stored beam |
1200-1600 |
booster low emittance study |
Yao |
No injection |
1600-1700 |
verify pinger/MPS trigger function. Requires stored beam and injection |
Yao/Harkay |
Stored beam & injection |
1700-2000 |
Bunch length vs. bunch current; baseline prior to SCU0 installation. Single bunch (up to 16-20 mA), hybrid lattice |
Harkay/Boon |
Stored beam & injection |
2000-2400 |
Beam tilt studies (24 singlets) |
Sereno/Lill |
Stored beam & injection |
|
Tuesday, March 27, 2012 |
|
|
0000-0400 |
Continue 4NLSS+RHB |
Sajaev |
Stored beam & inj. |
0400-0800 |
Setup RHB lattice, injection efficiency |
Sajaev |
Stored beam & inj. |
0800-1000 |
Set-up P0 feedback |
Yao |
Stored beam & inj. |
1000-1200 |
collect FPGA BPM data. Low current, single bunch. |
C. Wang/Yao |
Stored beam & inj. |
1200-1600 |
Orbit switch to 24 singlets RHB |
Xiao |
Stored beam & injection |
1600-1900 |
Sextupole offset measurements |
Xiao |
Stored beam & inj. |
1900-2300 |
29-ID XBPM measurements |
Decker/Yang |
Stored beam & inj. |
2300-2400 |
Tune vs scraper position. Tune scan tests with updated script. Current <60 mA, 24 bunches or 324 bunches. |
Harkay/Boon |
Stored beam & inj |
|
Wednesday, March 28, 2012 |
|
|
0000-0230 |
Tune vs scraper position. Tune scan tests with updated script. Current <60 mA, 24 bunches or 324 bunches. (continued |
Harkay/Boon |
Stored beam & inj |
0230-0630 |
4NLSS+SPX |
Sajaev |
Stored beam & inj. |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |