Machine Studies
Schedule for Run02-13, 2012
August 23th 0800 – August 24th 0000
Time |
Descriptions |
Studiers |
SR Status |
|
Thursday, August 23, 2012 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-1000 |
Prepare for high current studies |
OPS/Floor coordinators |
No Beam |
1000-1600 |
High current studies with shutters open |
OPS |
Stored Beam & Injection |
1600-1615 |
Recover from high current studies and prepare for other studies |
OPS |
Stored Beam & Injection |
1615-1700 |
Set up BLM device in 6-ID. |
Dooling |
Stored Beam & Injection |
1700-1800 |
Measure BPM noise floor in 24 singlets |
Lill |
Stored Beam & Injection |
1700-1800 |
Test 6-ID BLM device (parallel to BPM noise). |
Dooling |
Stored Beam & Injection |
1800-2000 |
Measure bunch length as a function of single bunch current |
Harkay Yang |
Stored Beam & Injection |
2000-2200 |
Test minimum possible number of orbit correctors. |
Emery |
Stored Beam & Injection |
2200-2400 |
Gentle shutdown |
OPS |
No Beam |