Machine Studies
Schedule for Run02-5, 2012
June 25th 0800 - June 27th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, June 25, 2012 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1330 |
Investigate IEX earth coil trips, resets, etc. |
Deriy, Xiao, M. Smith |
No beam |
0930-1600 |
Install temporary chiller in Bldg. 420 (no AC in 420, all Booster/BTS P.S. off, SR Dipole off, affected pumps off, all 420 RF systems off) |
FMS |
No beam |
0930-1230 |
change S Vacuum skid valves in sectors 13-14 and 39-40 |
Putnam |
No beam |
0930-1230 |
Swap out S26B:V2 & S21B:S2 P.S. |
Putkammer |
No beam |
0930-1130 |
Install a fiber cable from A014 to S2 DG rack |
Gold |
No impact |
0930-1330 |
Repair the reflected power meter on Harmonic amplifier #1, and test the system into the cavity |
T. Smith |
No beam |
0930-1600 |
Troubleshoot SR Tunnel AHU for Sectors 5/6, 7/8, |
Kailus/Erwin |
No impact |
0930-1330 |
Investigate PAR Septum needing setpoint entered twice |
Hillman |
No beam |
0930-1330 |
investigate S40A:Q5's read backs and Investigate sector 2:3's loss of communication. |
Puttkammer |
No beam |
0930-1330 |
Pre-mount the hardware for the magnet interlocks for the Linac correctors |
Hillman |
No beam |
1600-1800 |
Temperature recovery and recover Booster systems/420 RF systems |
OPS/multiple groups |
Stored Beam & Injection |
1800-2100 |
Damping time scan. |
Yao |
Stored Beam & Injection |
2100-2200 |
Set up P0 feedback for hybrid. |
Yao |
Stored Beam & Injection |
2200-2400 |
Complete hybrid lattice setup. |
Sajaev |
Stored Beam & Injection |
|
Tuesday, June 26, 2012 |
|
|
0000-0200 |
Complete hybrid lattice setup (continued). |
Sajaev |
Stored Beam & Injection |
0200-0600 |
Orbit switch. |
Xiao |
Stored Beam & Injection |
0600-0900 |
Investigate linac timing issues. |
Pietryla |
Injection available |
0900-1000 |
Tune PAR RF12 tuner output offset. |
Yao |
PAR beam |
0600-1000 |
Investigate IEX earth coil trips, resets, etc. |
Deriy, Xiao, M. Smith |
No beam |
1000-1200 |
FPGA data collection. |
Wang |
Stored Beam & Injection |
1200-1400 |
Tune up 375 MeV injection. |
Sereno Emery |
Stored Beam & Injection |
1400-1500 |
Test P0 amplifier EPICS Pvs. |
DiMonte |
Stored Beam & Injection |
1500-2100 |
IEX commissioning. |
Xiao |
Stored Beam & Injection |
2100-2300 |
Start 4NLSS+RHB lattice work. |
Xiao |
Stored Beam & Injection |
2300-2400 |
Continue 4NLSS+RHB lattice work. |
Sajaev |
Stored Beam & Injection |
|
Wednesday, June 27, 2012 |
|
|
0000-0300 |
4NLSS+RHB work (continued). |
Sajaev |
Stored Beam & Injection |
0300-0630 |
Injection studies. |
Sajaev |
Stored Beam & Injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |