Machine Studies
Schedule for Run02-7, 2012
July 9th 0800 - July 11th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, July 9, 2012 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1130 |
SR waveguide switch to RF2 & RF3 |
RF Group |
No beam |
0930-1130 |
IEX testing |
Deriy |
No beam |
0930-1330 |
replace bias card and upgrade firmware of S2 amplifiers |
Yao, Gold, Vendor |
No P0 feedback |
0930-1030 |
Remove standard fan from S38-04 and re-install prototype fan and controls. |
Erwin |
No beam |
0930-1330 |
investigate the loss of communications in the SR sector 2:3 |
Puttkammer |
No beam |
0930-1330 |
Investigate S10B:V2 readback errors |
Puttkammer |
No beam |
0930-1330 |
Test S40AQ5 converter read backs, |
Puttkammer |
No beam |
0930-1330 |
Replace cooling fans for the Canted Corrector power supplies (throughout the SR) |
Puttkammer |
No beam |
0930-1330 |
Replace the DAC board for S26BV2 |
Puttkammer |
No beam |
0930-1600 |
Troubleshoot SR Tunnel AHU for Sectors 23/24 |
Kailus/Erwin |
No impact |
0930-1330 |
Pre-mount the hardware for the magnet interlocks for the Linac correctors |
Hillman |
No beam |
1330-1400 |
13-ID End-to-End Test |
Banks |
No beam |
1330-1400 |
install new clock signals for P0 feedback system. Need to power down iocsrfb |
Scaminaci |
No beam |
1000-1200 |
Test rtfb iocs with no beam. |
Xu Lenkszus |
No beam |
1400-1600 |
Retune S14 and S40 temperature control loops. |
Putnam |
Stored Beam & Injection |
1600-2000 |
RHB lattice setup. |
Xiao |
Stored Beam & Injection |
2000-2400 |
Orbit switch. |
Xiao |
Stored Beam & Injection |
|
Tuesday, July 10, 2012 |
|
|
0000-0600 |
OPEN or BPM offset measurements. |
OPS |
Stored Beam & Injection |
0600-1000 |
Coupling correction testing in 4NLSS-RHB. |
Sajaev |
Stored Beam & Injection |
1000-1200 |
Test rtfb iocs with beam. |
Xu Lenkszus |
Stored Beam & Injection |
1200-1400 |
Booster injection controllaw measurements. |
Yao |
Stored Beam & Injection |
1400-1600 |
S19 vibration measurements setup test. Need shutter open. |
OPS |
Stored Beam & Injection |
1600-2000 |
Measure various P0 feedback correlations. |
Yao |
Stored Beam & Injection |
2000-2400 |
IEX commissioning. |
Xiao |
Stored Beam & Injection |
|
Wednesday, July 11, 2012 |
|
|
0000-0300 |
IEX commissioning (continued). |
Xiao |
Stored Beam & Injection |
0300-0630 |
OPEN or BPM offset measurements. |
OPS |
Stored Beam & Injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |