Machine Studies
Schedule for Run02-7, 2012
July 17th 0800 – July 18th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, July 17, 2012 |
|
|
0800-1200 |
Vibration measurements w/ shutters open |
OPS/FMS |
Stored beam & Injection |
1200-1210 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
1210-1300 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
1300-1500 |
Investigate S40A:Q5 read back |
Puttkammer |
No Beam |
1300-1500 |
Connect external monitors at S10 & 19 |
Wang |
No Beam |
1300-1500 |
Install fan regulation system in S38 |
Erwin |
No Beam |
1300-1400 |
Test rtfb iocs. |
Xu Lenkszus |
No Beam |
1500-1700 |
Turn-by-turn measurements with FPGA bpms. |
Wang |
Stored Beam & Injection |
1700-1900 |
Measure stripline drive strength. |
Yao |
Stored Beam & Injection |
1900-2200 |
Accumulation limit vs P0 amplifier power measurements. |
Yao |
Stored Beam & Injection |
2200-2400 |
IEX commissioning. |
Xiao |
Stored Beam & Injection |
|
Wednesday, July 18, 2012 |
|
|
0000-0400 |
IEX commissioning (continued). |
Xiao |
Stored Beam & Injection |
0400-0700 |
OPEN or bpm offset measurements. |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |