Machine Studies

Draft Schedule for Run02-9, 2012

July 24th 0800 - July 25th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, July 24, 2011



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-0930

Reboot interleaving PS

PS Group

Limited Injection

0900-1000

Test RTFB iocs

Xu/Lenkszus

No Beam

0900-1100

Replace interface board S40 cab 3

PS Group

No Beam

0900-1100

Move external monitor from S10

PS Group

No Beam

0930-1000

Map S6 support stand

Trakhtenberg

Access Zone A

1100-1300

Test changes to RTFB iocs with beam

Xu/Lenkszus

Stored beam& injection

1300-1500

Investigate flicker in S35-Pinhole camera

Yang/Shoaf

Stored beam

1400-1500

Check and adjust booster ramp waveform

Yao, Horan

Booster beam only

1500-1700

Calibrate S35 stripline kick strength at different gains. 24 singlet

Yao

Stored beam & injection

1700-2000

optics measurement with FPGA

Wang, C.

Stored beam & injection

2000-2400

IEX study

Xiao

Stored beam & inection


Wednesday, July 25, 2011



0000-0200

IEX study (continued)

Xiao

Stored beam & injection

0200-0600

Continue P1 BPM offset measurements

Xiao/Boon

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection