Machine Studies
Draft Schedule for Run02-9, 2012
July 24th 0800 - July 25th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, July 24, 2011 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-0930 |
Reboot interleaving PS |
PS Group |
Limited Injection |
0900-1000 |
Test RTFB iocs |
Xu/Lenkszus |
No Beam |
0900-1100 |
Replace interface board S40 cab 3 |
PS Group |
No Beam |
0900-1100 |
Move external monitor from S10 |
PS Group |
No Beam |
0930-1000 |
Map S6 support stand |
Trakhtenberg |
Access Zone A |
1100-1300 |
Test changes to RTFB iocs with beam |
Xu/Lenkszus |
Stored beam& injection |
1300-1500 |
Investigate flicker in S35-Pinhole camera |
Yang/Shoaf |
Stored beam |
1400-1500 |
Check and adjust booster ramp waveform |
Yao, Horan |
Booster beam only |
1500-1700 |
Calibrate S35 stripline kick strength at different gains. 24 singlet |
Yao |
Stored beam & injection |
1700-2000 |
optics measurement with FPGA |
Wang, C. |
Stored beam & injection |
2000-2400 |
IEX study |
Xiao |
Stored beam & inection |
|
Wednesday, July 25, 2011 |
|
|
0000-0200 |
IEX study (continued) |
Xiao |
Stored beam & injection |
0200-0600 |
Continue P1 BPM offset measurements |
Xiao/Boon |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |