Machine Studies

Draft Schedule for Run03-11, 2012

December 11th 0800 – December 12th 0800

Time

Descriptions

Studiers

SR Status


Tuesday, December 11, 2012



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder/

OPS

Stored Beam & Injection

0930-1030

Modify BM6 Fan Db

Lenkszus

No Beam

0930-1130

Test new Booster dipole ADC

Yao, Xu, Shang

Limited Injection

0930-1130

Replace RF cavity blowers S38

Morrison

Access Zone F

0930-1130

Move external monitors in Zone F

Wang

No Beam

0930-1130

Investigate end state of SR converter standardization subroutine in EPICS

Fors

No Beam

0930-1130

Wire RTDs in BPM racks

Erwin

No Beam

0930-1130

Replace BPM rack fans

Erwin

No Beam

1130-1200

Recover stored beam

OPS

Stored beam & injection

1200-1400

Continue with energy spread measurement

Chae

Stored beam & injection

1200-1600

BPM electronics testing (parasitic)

Decker

Stored beam

1400-1800

Bunch length measurements, single bunch, with the streak camera for SCU0

Harkay/ Boon/Yang

Stored beam & injection

1800-2000

Corrector punchdown

Xiao

Stored beam & injection

2000-2400

Dynamic aperature studies

Xiao/Sajaev

Stored beam & injection


Wednesday, December 12, 2012



0000-0200

Dynamic aperature studies (continued)

Xiao/Sajaev

Stored beam & injection

0200-0700

Studies

Sajaev

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection