Machine Studies
Schedule for Run03-2, 2012
October 8th 0800 – October 10th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 8, 2012 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-0945 |
Correct meter values at RF4 |
RF group |
No Beam |
0930-1030 |
Troubleshoot IEX ID control |
Smith, M. |
No Beam |
0930-1030 |
Reboot iocs s5fb, s7fb & s33fb |
Lenkszus |
No Beam |
0930-1130 |
Re-install 400W amplifier at L1 |
RF group |
No Injection |
0930-1000 |
Replace L4 WS1 AB Analog module (system needs to be shut down) |
Wright |
No injection |
0930-1200 |
Troubleshoot 12ID FEEPS |
McNamara |
No Beam |
0930-1030 |
Replace P0 feedback amplifiers in S2 |
Gold/Yao |
No Beam |
0930-1230 |
Hook up external current monitors in Zone E |
Wang |
No Beam |
0930-1230 |
BEK meter troubleshooting |
Donley |
Limited injection |
0930-1230 |
SR PS script testing |
Fors |
No Beam |
0930-1330 |
Investigate a DAC issue with the Par Septum power supply. |
Hillman |
No injection |
0930-1330 |
Booster ADC card test |
Yao/Shang/ Wang |
No injection |
1000-1200 |
Replace blowers in S38 cavity #3 |
Morrison |
Access Zone F |
1000-1200 |
Investigate/replace 8-ID encoder |
Merritt/ Grimmer |
Access Zone A |
1000-1200 |
Replace BTSFS3 camera |
Berg |
Access Zone F |
1230-1600 |
Troubleshoot reflected power problem at PAR RF12 |
RF group |
Limited Injection |
1200-1400 |
Test loss monitor scopes |
Brill |
No Beam |
1600-1700 |
check PAR harmonic RF with beam |
Yao |
Limited injection |
1700-1900 |
minimize booster vertical corrector current |
Yao |
Limited injection |
1900-2400 |
IEX correction |
Xiao |
Stored beam & injection |
|
Tuesday, October 9, 2012 |
|
|
0000-0100 |
IEX correction (continued) |
Xiao |
Stored beam & injection |
0100-0700 |
Impedance test lattice setup |
Sajaev |
Stored beam & injection |
0730-0800 |
Fill SR 102mA, 24 singlets (UBOP) before shutting down linac for access |
OPS |
Stored beam |
0800-1100 |
Take deflecting cavity measurements |
RF group |
Access Linac |
0900-1100 |
Growth rate measurements |
Chae/Yao |
Stored beam |
1100-1130 |
Recover linac/PAR |
OPS |
No injection |
1130-1200 |
Check changes to PAR RF harmonic |
Smith, T. |
Limited injection |
1200-1500 |
high single-bunch charge accumulation limit study |
Yao |
Stored beam & injection |
1500-1900 |
Collect Xbpm data |
Decker/Hahne |
Stored beam & injection |
1900-2400 |
IEX correction |
Xiao |
Stored beam & injection |
|
Wednesday, October 10, 2012 |
|
|
0000-0100 |
IEX correction (continued) |
Xiao |
Stored beam & injection |
0100-0700 |
injection studies |
Sajaev |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |