Machine Studies

Schedule for Run03-3, 2012

October 16th 0800 - October 17th 0800

Time

Descriptions

Studiers

SR Status


Tuesday, October 16, 2012



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0930-1000

Change trip settings on RF1 and test stand gauges

Horan

No Beam

0930-1130

SRF PEM testing

Schroeder/ Soliday

No Beam

0930-1130

Measure remote readbacks on PAR RF1

RF group

Limited Injection

0930-1130

Re-install 400W amplifier at L1 (validation needed)

RF Group

No injection

0930-1130

Troubleshoot B:EK meter issue

Donley

No Injection

0930-1130

Investigate S8A:H1 slot

Puttkammer

No Beam

0930-1130

Investigate S40AQ5 converter dac noise

Puttkammer

No beam

0930-1130

Booster ADC test

Yao/Shang/Xu/ Wang/Laird

Limited Injection

0930-1200

Move external monitoring equipment (Zone E)

Wang

No Beam

0930-1200

S:IK3 troubleshooting

Hillman

No Beam

1130-1300

booster ramp current new ADC test w/beam

Yao/Shang/Xu/ Wang/Laird

Limited Injection

1300-1500

measure tune slope in impedance test lattice

Sajaev/Yao

Stored beam &inj.

1500-1700

Single bunch accumulation limits

Yao

Stored beam & inj.

1700-1900

acquire 12 second fpga bpm data and update single bunch/hybrid SBPMWaveform preferredchoice files for proper triggering of S38 bpms.

Sereno

Stored beam & injection

1900-2100

CPU Study

Xiao

Stored beam

2100-2400

IEX Study

Xiao

Stored beam & injection


Wednesday, October 17, 2012



0000-0100

IEX study (continued)

Xiao

Stored beam & injection

0100-0500

Impedance studies

Sajaev

Stored beam & injection

0500-0700

test a few storage ring feedback iocs' upgrade with beam

S. Xu, Lenkszus

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection