Machine Studies
Schedule for Run03-4, 2012
October 23rd 0800 - October 24th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, October 23, 2012 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0800-0930 |
S35 pinhole camera set-up |
Yang |
Stored beam & injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/OPS |
Stored Beam & Injection |
0810-0930 |
Troubleshoot sector 37 cavity 4 IR detector meter |
Morrison |
No Impact |
0930-1030 |
replace a power supply for the Johnson controls PLC in building 411 (Affects all injectors through Booster injection) |
Wright |
No injection |
0930-1030 |
Waveguide switch from RF-2 to RF-3 |
RF Group |
No Beam |
1030-1230 |
Troubleshoot charge delay on B:IS:PS |
Puttkammer |
No injection |
1030-1130 |
Inspect B:BM current conversion card |
Wang |
No Injection |
0930-1330 |
Perform klystron heater curve on RF4 klystron |
RF Group |
No Beam |
0930-1330 |
Swap S:IK3 thyratron |
Donley |
No Beam |
0930-1230 |
Investigate S40A:Q5 and S16A:Q5 readback glitches |
Fors |
No Beam |
1330-1400 |
Check S:IK3 timing and recover SR |
OPS |
Stored beam & inj. |
1400-1600 |
investigate P0 feedback event. |
Yao |
Stored beam & injection |
1600-2000 |
Collect FPGA bpm data with punched down correctors. |
Sereno/Emery |
Stored beam & injection |
2000-2400 |
IEX study |
Xiao |
Stored beam & injection |
|
Wednesday, October 24, 2012 |
|
|
0000-0100 |
IEX study |
Xiao |
Stored beam & injection |
0100-0300 |
setup hybrid lattice |
Sajaev |
Stored beam & inj. |
0300-0700 |
continue impedance lattice studies |
Sajaev |
Stored beam & inj. |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |