Machine Studies
Draft Schedule for Run03-5, 2012
October 29th 0800 – October 31 st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 29, 2012 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/OPS |
Stored Beam & Injection |
0930-1330 |
Troubleshoot problem with AGC loop for RF3/S36/S37 |
RF Group |
No Beam |
0930-1130 |
Linac studies -- water station PID loop tuning automation |
Pasky/ Sereno |
No injection |
0930-1330 |
Waveguide switches to verify RF-1 phase loop and back |
RF Group |
No Beam |
0930-1030 |
AHU work for S37/38 |
Erwin/FMS |
No Beam |
0930-1130 |
Replace filters on S5&6 vacuum chamber cooling water skid |
Swetin |
No beam |
0930-1230 |
Testing IEX control |
Xiao |
No beam |
0930-1330 |
Replace the ECF diode stack in BES2 Septum power supply |
Deriy |
No Beam |
0930-1330 |
Move the external current monitors on SR Sextupoles in Zone E |
Wang |
No Beam |
0930-1330 |
Investigate glitchy read-backs in S40AQ5 converters and script testing |
Fors |
No Beam |
0930-1330 |
Upgrade the Canted Corrector cooling fans in sector 12 and 34 |
Puttkammer |
No Beam |
0930-1330 |
Investigate why L1:QM2 power supply won’t turn on remotely |
Donkers |
Limited Injection |
0930-1130 |
Conduct B&K Modulator Module measurements at RF2, RF3 and RF4 |
Berenc |
No beam |
0930-1430 |
Replace valve & actuator in S13/14 Vacuum chamber water skid (water skid shutdown) |
Putnam |
No beam |
1000-1030 |
Switch process water pump for S35/36 |
Wright |
No Beam |
1100-1630 |
Booster main ramp ADC test (Limited injection from 14:30) |
Yao/Wang/ S. Xu/Shang |
Limited Injection |
1330-1430 |
PAR requealification |
Pasky/ACO |
Limited injection |
1430-1630 |
Tune PID loop for S13/14 vacuum chamber water skid |
Putnam |
Stored beam |
1430-1630 |
Set-up pinhole camera |
Yang |
Stored beam |
1630-1830 |
Set-up P0 feedback for hybrid |
Yao |
Stored beam & injection |
1830-2400 |
SCU0 thermal studies with 6BM steering |
Harkay/Boon |
Stored bean & injection |
|
Tuesday, October 30, 2012 |
|
|
0000-0400 |
Orbit recovery |
Xiao |
Stored beam & injection |
0400-0800 |
CPU studies |
Xiao |
Stored beam & inj. |
0800-1000 |
test a few storage ring feedback iocs' upgrade with beam |
S. Xu, Lenkszus |
Stored beam & injection |
1000-1030 |
Set-up for 130mA study |
OPS/Schroeder |
Stored beam & inj. |
1030-1430 |
130mA study, 24 singlets |
Harkay/ Schroeder |
Stored beam & inj. |
1030-1430 |
record pressure and BLM data during the 130 mA study. |
Dooling |
Stored beam & inj. |
1430-1500 |
Recover from 130mA study |
OPS/Schroeder |
Stored beam & inj. |
1500-1600 |
test swtich chromaticity app |
Yao/Shang |
Stored beam & inj. |
1600-1800 |
Single bunch accumulation limi |
Yao |
Stored beam & inj. |
1800-2000 |
FPGA BPM based optics correction. Low current single bunch with occasional injection |
C. Wang |
Stored beam & inj. |
2000-2400 |
IEX studies |
Xiao |
Stored beam & injection |
|
Wednesday, October 31, 2012 |
|
|
0000-0100 |
IEX studies |
Xiao |
Stored beam & injection |
0100-0700 |
Continue impedance lattice studies |
Sajaev |
Stored Beam & injection |
0700-0800 |
Prepare for User beam |
OPS |