Machine Studies

Schedule for Run03-6, 2012

November 6th 0800 – November 7tht 0800

Time

Descriptions

Studiers

SR Status


Tuesday, November 6, 2012



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0810-0930

measure S38 bpm noise with hybrid top-up (parasitic)

Sereno

Stored beam & injection

0930-1000

Reboot interleaving DSPs

PS Group

Limited Injection

0930-1030

Test repaired Pentek 4283 DSP card in iocs1fb

Lenkszus

No Beam

0930-1100

Work on control valve actuator for S13-14

Putnam

No Beam

0930-1000

PSS end to end test 29ID

McNamara

A-E in controlled access

0930-1130

Replace chilled water filters on vacuum chamber cooling water skids SRVC-04, 10, 12, 28, 36

Swetin

No impact

0930-1130

Move external monitoring equipment in Zone E

J. Wang

No Beam

0930-1230

test the IEX control software

Xiao/M. Smith

No beam

0930-1130

Investigate Dac clamp in S8A:H1

Fors

No Beam

0930-1130

Connect L1 Quads Gespac fiber

Hillman

Limited Injection

0930-1130

Replace B:IS HVPS

Deriy

No Injection

0930-1130

Replace 20MHz source/distribution chassis in Linac 

Horan

No Injection

0930-1330

Perform heater emission curve on RF3

RF Group

No Beam

0930-1130

Test Booster ramp new ADC

Yao, Xu, Laird

No Injection

1300-1330

measure the beam size at LTP:FL1

Sereno

No injection

1330-1400

test button to disable 2 Hz triggering of FPGA bpms.

Sereno

No injection

1400-1600

Tune PID loop with beam (S13-14 Vacuum Skid Water)

Putnam

Stored beam & occ. inj.

1400-1600

Continue to measure S38 bpm noise with hybrid top-up (parasitic)

Sereno

Stored beam & injection

1600-1800

collect noise response of beam with P0 feedback on (hybrid fill)

Yao

Stored beam & inj.

1800-2400

IEX studies

Xiao

Stored beam & inj


Wednesday, November 7, 2012



0000-0300

Optics corrections

C. Wang

Stored beam & injection

0300-0700

Impedance lattice studies

Sajaev

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection