Machine Studies

Draft Schedule for Run03-7, 2012

November 12th 0800 – November 14th 0800

Time

Descriptions

Studiers

SR Status


Monday, November 12, 2012



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder/

OPS

Stored Beam & Injection

0930-1130

Maintenance on Controls virtual servers

Robinson

No Beam

0930-1130

Replace EMI PS in L4

RF Group

No Injection

0930-1230

Investigate faulty cable for siocltsintlks

Pietryla

Limited Injection

0930-1130

Install 4KW atten in the par harm. system. and re-mount harm. #1 and 2 to the floor

RF group

No injection

0930-1230

testing IEX control system with no beam

Xiao/M. Smith

No Injection

0930-1130

turn on the return air fan for AHU 5018

FMS

No impact

0930-1230

Test Booster ramp ADC card

Wang, Yao, Shang, Xu

Limited Injection

0930-1230

Move external monitors in Zone F

PS Group

No Beam

0930-1230

Investigate Dac clamp issue at S8A:H1

Sprau

No Beam

1000-1100

Replace and align BTS:FS3 camera

Berg

Access Zone F

1000-1230

Install IR cable between S37/C4 and bldg 420 (first hour in tunnel/out of tunnel the remainder of time)

RF group

Access Zone F / No Beam

1100-1200

Determine new LTP flag location

Berg

Access Linac

1100-1200

verify PCGun piping configuration

MOM

Access Linac

1100-1230

Continue investigate S40A:Q5

Puttkammer

No beam

1100-1300

Test prototype modulator card at RF4

RF Group

No Beam

1300-1500

Testing IEX control system beam

Xiao/M. Smith

Stored beam & injection

1500-1800

Set-up 24 singlet lattice

Sajaev

Stored beam & injection

1800-2200

Injection studies

Sajaev

Stored beam & injection

2200-2400

Orbit switch

Xiao

Stored beam & injection


Tuesday, November 13, 2012



0000-0200

Orbit switch

Xiao

Stored beam & injection

0200-0800

Test run IEX

Xiao

Stored beam & injection

0800-1000

study temperature control valve action on the sectors 13 - 14 vacuum skid

Putnam

Stored beam & injection

0800-1100

run parasitically with beam to look at the Bergoz loss monitor in S35 ID-A hutch

Dooling/ Stein

Stored beam & injection

1100-1500

optics correction study.

C Wang/ Yao/Shang

Stored beam & injection

1500-2100

Local impedance measurement

Sajaev

Stored & injection

2100-2400

Measure P0FB damping rate will scanning attenuators (singlet or hybrid fill)

Yao

Stored beam & injection


Wednesday, November 14, 2012



0000-0630

CPU studies

Xiao

Stored beam

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection