Draft Schedule for Run03-9, 2012
November 27th 0800 – November 28th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, November 27, 2011 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/OPS |
Stored Beam & Injection |
0930-1000 |
Reboot interleaving DSPs |
PS group |
No Injection |
0930-0940 |
Condition IEX magnets |
OPS/Schroeder |
No beam |
0930-1200 |
Replace RF cavity blowers S36 |
Morrison |
Zone F Access |
0930-1030 |
Relocate diagnostic FPGA iocbunchpure2 |
Shoaf |
No Beam |
0930-1030 |
Install virtual BPM database in iocsbpmdp |
Lenkszus |
No Beam |
0930-1130 |
Investigate B:IS issues |
Deriy |
No Beam |
0930-1230 |
Investigate bit-bus errors in S25 & S36 |
Puttkammer |
No Beam |
0930-1230 |
Measure ground fault currents S2:3 |
Sprau |
No Beam |
1200-1500 |
Test modulator module at RF4 |
RF Group |
No Beam |
1230-1430 |
Move external monitors in Zone F |
J. Wang |
No Beam |
1430-1500 |
Recover all systems in preparation for storing beam at 15:00 |
OPS |
Stored beam & injection |
1500-1800 |
test booster ramp new ADC card, requires SR BM and RF running normal level |
Yao/J. Wang/ Shang/S. Xu/ Laird |
No injection |
1800-2200 |
bunch length vs bunch current using the streak camera. Single bunch 0-20 mA |
Harkay/Boon/Yang |
Stored Beam & injection |
2200-2400 |
CPU studies |
Xiao |
Stored beam & injection |
|
Wednesday, November 28, 2011 |
|
|
2200-0300 |
CPU studies (continued) |
Xiao |
Stored beam & injection |
0300-0700 |
IEX readiness |
OPS/Xiao |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |