Machine Studies
Draft Schedule for Run01-1, 2013
January 22nd 0800 – January 29th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Saturday, January 19, 2013 |
|
|
0000-1500 |
RF conditioning, 24 singlets. |
OPS |
Stored Beam & Injection |
1500-1700 |
SCU0 orbit tests. |
Harkay |
Stored Beam & Injection |
1700-2300 |
Initial BPM system checkout. |
Decker Sereno |
Stored Beam & Injection |
2300-2400 |
Orbit recovery. |
Xiao |
Stored Beam & Injection |
|
Sunday, January 20, 2013 |
|
|
0000-0500 |
Orbit recovery (continued). |
Xiao |
Stored Beam & Injection |
0500-1000 |
SCU0 commissioning. |
Sajaev |
Stored Beam & Injection |
1000-1500 |
SCU0 commissioning. |
Harkay |
Stored Beam & Injection |
1500-2000 |
SCU0 commissioning. |
Borland |
Stored Beam & Injection |
2000-2400 |
SCU0 commissioning. |
Emery |
Stored Beam & Injection |
|
Monday, January 21, 2013 |
|
|
0000-0100 |
SCU0 commissioning. |
Emery |
Stored Beam & Injection |
0100-0600 |
SCU0 commissioning. |
Xiao |
Stored Beam & Injection |
0600-0800 |
SCU0 commissioning. |
Sajaev |
Stored Beam & Injection |
0800-1600 |
SCU0 test with user. |
SCU0 team |
Stored Beam & Injection |
1600-2000 |
Rematch S3 stripline signal and test P0 feedback. |
Yao Gold |
Stored Beam & Injection |
2000-2400 |
Intermediate BPM system checkout. |
Decker Sereno |
Stored Beam & Injection |
|
Tuesday, January 22, 2013 |
|
|
0000-0200 |
Intermediate BPM system checkout (continued). |
Decker Sereno |
Stored Beam & Injection |
0200-0800 |
CPU checkout 1. |
Xiao |
Stored Beam & Injection |
0800-1400 |
Orbit recovery in sectors 23, 24, 33, and 34. |
Sajaev |
Stored Beam & Injection |
1400-1700 |
Test feedback IOC upgrade. |
Xu |
Stored Beam & Injection |
1700-2300 |
Xbpm data collection. |
Decker Hahne |
Stored Beam & Injection |
2300-2400 |
ID steering, lattice correction, reduce chromaticity, use P0 feedback. |
Sajaev |
Stored Beam & Injection |
|
Wednesday, January 23, 2013 |
|
|
0000-0500 |
Lattice correction (continued). |
Sajaev |
Stored Beam & Injection |
0500-0800 |
Test optics correction with FPGA bpms. |
Wang |
Stored Beam & Injection |
0800-1000 |
Measure Booster chromaticity. |
Yao |
Stored Beam & Injection |
1000-1200 |
Check PAR bunch cleaning system. SR available. |
Yao Gold |
Stored Beam & Injection |
1200-1400 |
Tune up Booster injection. SR available. |
Sereno Yao Pasky |
Stored Beam & Injection |
1400-2000 |
CPU checkout 2. |
Xiao |
Stored Beam & Injection |
2000-2400 |
Finish lattice correction, set up hybrid, take SCU0 temperature measurements with hybrid. |
Sajaev |
Stored Beam & Injection |
|
Thursday, January 24, 2013 |
|
|
0000-0200 |
Set up hybrid (continued). |
Sajaev |
Stored Beam & Injection |
0200-0700 |
Test optics correction with FPGA bpms. |
Wang |
Stored Beam & Injection |
0700-0900 |
Verify Linac interlock screen |
Pasky/Pietryla |
Limited Injection |
0730-1130 |
Connect flow meters to controls system for vc cooling skids sectors 25/26 & 29/30. |
Putnam |
No beam |
0800-0900 |
Replace a suspect attenuator at RF4 |
Berenc |
No beam |
0800-1200 |
PSS shutter checkouts / End to End tests |
SI group |
No Beam |
0800-1200 |
SCU0 realignment |
MD group |
No beam |
0800-1000 |
investigate why the dump resistor fuse blew in SR 26:27 Raw T2 |
Puttkammer |
No beam |
0090-0930 |
LACIS validations |
Dooling |
If supported by Linac studies |
0930-1030 |
Linac training |
Pasky/Operator |
Limited injection |
1030-1130 |
Linac training |
Pasky/Operator |
Limited injection |
1200-1600 |
Repeat ID and BM steering scans for SCU0 after realignment. |
Emery Borland Boon |
Stored Beam & Injection |
1600-2400 |
CPU+IEX nonlinear studies. |
Xiao |
Stored Beam & Injection |
|
Friday, January 25, 2013 |
|
|
0000-0800 |
Mapping of BM SR power on SCU0 chamber. |
Boon Harkay |
Stored Beam & Injection |
0800-1000 |
SCU0 steering optimization. |
Schroeder |
Stored Beam & Injection |
1000-1800 |
SCU0 tests with user, shutter open. |
OPS |
Stored Beam & Injection |
1600-1800 |
Measure tune slope in 24 singlets (SCU0 transparency test).[Canceled] |
Emery |
Stored Beam & Injection |
1800-2400 |
SCU0 coupling feedforward studies. |
Emery |
Stored Beam & Injection |
|
Saturday, January 26, 2013 |
|
|
0000-1000 |
IEX checkout 1. |
Xiao |
Stored Beam & Injection |
1000-1600 |
SCU0 ID6 beamline studies., shutter open |
ID6 |
Stored Beam & Injection |
1600-2400 |
Diagnostics checkout. |
Sereno |
Stored Beam & Injection |
|
Sunday, January 27, 2013 |
|
|
0000-1000 |
IEX checkout 2. |
Xiao |
Stored Beam & Injection |
1000-1600 |
OPEN. |
|
Stored Beam & Injection |
1600-2400 |
Top-up test. |
OPS |
Stored Beam & Injection |
|
Monday, January 28, 2013 |
|
|
0000-0600 |
Set up APS-U lattice. |
Sajaev |
Stored Beam & Injection |
0600-0700 |
8-ID PSS end-to-end test |
Mike Fagan / SI group |
No beam |
0700-0800 |
Rf synthesizer switch + other |
RF group + other |
No beam |
0800-1400 |
SCU0 tests with user, shutter open. |
OPS |
Stored Beam & Injection |
1400-1600 |
Final pinhole setup. |
Yang |
Stored Beam & Injection |
1600-1800 |
Set-up bunch purity monitor – parasitic |
Yang |
Stored Beam & injection |
1600-2200 |
Final BPM system checkout. |
Decker Hahne Sereno |
Stored Beam & Injection |
2200-2400 |
Final injection setup. |
Sajaev |
Stored Beam & Injection |
|
Tuesday, January 29, 2013 |
|
|
0000-0200 |
Final injection setup (continued). |
Sajaev |
Stored Beam & Injection |
0200-0600 |
Final lattice setup. |
Sajaev |
Stored Beam & Injection |
0630-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |