Draft Schedule for Run01-1, 2013

January 22nd 0800 – January 29th 0800

Time

Descriptions

Studiers

SR Status


Saturday, January 19, 2013



0000-1500

RF conditioning, 24 singlets.

OPS

Stored Beam & Injection

1500-1700

SCU0 orbit tests.

Harkay

Stored Beam & Injection

1700-2300

Initial BPM system checkout.

Decker Sereno

Stored Beam & Injection

2300-2400

Orbit recovery.

Xiao

Stored Beam & Injection


Sunday, January 20, 2013



0000-0500

Orbit recovery (continued).

Xiao

Stored Beam & Injection

0500-1000

SCU0 commissioning.

Sajaev

Stored Beam & Injection

1000-1500

SCU0 commissioning.

Harkay

Stored Beam & Injection

1500-2000

SCU0 commissioning.

Borland

Stored Beam & Injection

2000-2400

SCU0 commissioning.

Emery

Stored Beam & Injection


Monday, January 21, 2013



0000-0100

SCU0 commissioning.

Emery

Stored Beam & Injection

0100-0600

SCU0 commissioning.

Xiao

Stored Beam & Injection

0600-0800

SCU0 commissioning.

Sajaev

Stored Beam & Injection

0800-1600

SCU0 test with user.

SCU0 team

Stored Beam & Injection

1600-2000

Rematch S3 stripline signal and test P0 feedback.

Yao Gold

Stored Beam & Injection

2000-2400

Intermediate BPM system checkout.

Decker Sereno

Stored Beam & Injection


Tuesday, January 22, 2013



0000-0200

Intermediate BPM system checkout (continued).

Decker Sereno

Stored Beam & Injection

0200-0800

CPU checkout 1.

Xiao

Stored Beam & Injection

0800-1400

Orbit recovery in sectors 23, 24, 33, and 34.

Sajaev

Stored Beam & Injection

1400-1700

Test feedback IOC upgrade.

Xu

Stored Beam & Injection

1700-2300

Xbpm data collection.

Decker Hahne

Stored Beam & Injection

2300-2400

ID steering, lattice correction, reduce chromaticity, use P0 feedback.

Sajaev

Stored Beam & Injection


Wednesday, January 23, 2013



0000-0500

Lattice correction (continued).

Sajaev

Stored Beam & Injection

0500-0800

Test optics correction with FPGA bpms.

Wang

Stored Beam & Injection

0800-1000

Measure Booster chromaticity.

Yao

Stored Beam & Injection

1000-1200

Check PAR bunch cleaning system. SR available.

Yao Gold

Stored Beam & Injection

1200-1400

Tune up Booster injection. SR available.

Sereno Yao Pasky

Stored Beam & Injection

1400-2000

CPU checkout 2.

Xiao

Stored Beam & Injection

2000-2400

Finish lattice correction, set up hybrid, take SCU0 temperature measurements with hybrid.

Sajaev

Stored Beam & Injection


Thursday, January 24, 2013



0000-0200

Set up hybrid (continued).

Sajaev

Stored Beam & Injection

0200-0700

Test optics correction with FPGA bpms.

Wang

Stored Beam & Injection

0700-0900

Verify Linac interlock screen

Pasky/Pietryla

Limited Injection

0730-1130

Connect flow meters to controls system for vc cooling skids sectors 25/26 & 29/30.

Putnam

No beam

0800-0900

Replace a suspect attenuator at RF4

Berenc

No beam

0800-1200

PSS shutter checkouts / End to End tests

SI group

No Beam

0800-1200

SCU0 realignment

MD group

No beam

0800-1000

investigate why the dump resistor fuse blew in SR 26:27 Raw T2

Puttkammer

No beam

0090-0930

LACIS validations

Dooling

If supported by Linac studies

0930-1030

Linac training

Pasky/Operator

Limited injection

1030-1130

Linac training

Pasky/Operator

Limited injection

1200-1600

Repeat ID and BM steering scans for SCU0 after realignment.

Emery Borland Boon

Stored Beam & Injection

1600-2400

CPU+IEX nonlinear studies.

Xiao

Stored Beam & Injection


Friday, January 25, 2013



0000-0800

Mapping of BM SR power on SCU0 chamber.

Boon Harkay

Stored Beam & Injection

0800-1000

SCU0 steering optimization.

Schroeder

Stored Beam & Injection

1000-1800

SCU0 tests with user, shutter open.

OPS

Stored Beam & Injection

1600-1800

Measure tune slope in 24 singlets (SCU0 transparency test).[Canceled]

Emery

Stored Beam & Injection

1800-2400

SCU0 coupling feedforward studies.

Emery

Stored Beam & Injection


Saturday, January 26, 2013



0000-1000

IEX checkout 1.

Xiao

Stored Beam & Injection

1000-1600

SCU0 ID6 beamline studies., shutter open

ID6

Stored Beam & Injection

1600-2400

Diagnostics checkout.

Sereno

Stored Beam & Injection


Sunday, January 27, 2013



0000-1000

IEX checkout 2.

Xiao

Stored Beam & Injection

1000-1600

OPEN.


Stored Beam & Injection

1600-2400

Top-up test.

OPS

Stored Beam & Injection


Monday, January 28, 2013



0000-0600

Set up APS-U lattice.

Sajaev

Stored Beam & Injection

0600-0700

8-ID PSS end-to-end test

Mike Fagan / SI group

No beam

0700-0800

Rf synthesizer switch + other

RF group + other

No beam

0800-1400

SCU0 tests with user, shutter open.

OPS

Stored Beam & Injection

1400-1600

Final pinhole setup.

Yang

Stored Beam & Injection

1600-1800

Set-up bunch purity monitor – parasitic

Yang

Stored Beam & injection

1600-2200

Final BPM system checkout.

Decker Hahne Sereno

Stored Beam & Injection

2200-2400

Final injection setup.

Sajaev

Stored Beam & Injection


Tuesday, January 29, 2013



0000-0200

Final injection setup (continued).

Sajaev

Stored Beam & Injection

0200-0600

Final lattice setup.

Sajaev

Stored Beam & Injection

0630-0800

Prepare for user Operations (24 singlets – Top-Up)

Ops

Stored Beam & Injection