Machine Studies
Schedule for Run01-13, 2013
April 24th 0800 – April 25th 2400
Time |
Descriptions |
Studiers |
SR Status |
|
Wednesday, April 24, 2012 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0830 |
Set-up for 130 & 150mA studies with User Participation |
Multiple Groups |
No beam |
0830-2400 |
Store 102mA , give shutter permit -- follow detail plan schedule |
|
Stored beam & injection |
|
Thursday, April 25, 2013 |
|
|
0000-0100 |
P1 BPM offset measurement |
Xiao |
Stored Beam & Injection |
0200-0930 |
Measure temperatures/pressures through SCU0 chamber from 102 to 150mA |
Harkay |
Stored Beam & Injection |
0930-1100 |
25 mA, ID scan, vertical steering (for SCU0 chamber alignment) |
Harkay |
Stored beam & injection |
1100-1300 |
Accumulation limit measuresments |
Sajaev |
Stored beam & injection |
1300-1500 |
Bus tie and test Booster dipole with master & slave on same transformer |
Wang, Ju |
No injection |
1300-1400 |
X-ray BPM raw blade spectrum analysis |
Lill/Hahne/Bui |
Stored beam |
1500-2000 |
Continue Accumulation limit measurements |
Sajaev |
Stored beam & injection |
2000-2200 |
OPEN |
|
|
2200-2400 |
Bring down injectors, slow shutdown of SR P.S. and RF in preparation for shutdown |
MCR |
No beam |