Machine Studies

Schedule for Run01-13, 2013

April 24th 0800 – April 25th 2400



Time

Descriptions

Studiers

SR Status


Wednesday, April 24, 2012



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0830

Set-up for 130 & 150mA studies with User Participation

Multiple Groups

No beam

0830-2400

Store 102mA , give shutter permit -- follow detail plan schedule


Stored beam & injection


Thursday, April 25, 2013



0000-0100

P1 BPM offset measurement

Xiao

Stored Beam & Injection

0200-0930

Measure temperatures/pressures through SCU0 chamber from 102 to 150mA

Harkay

Stored Beam & Injection

0930-1100

25 mA, ID scan, vertical steering (for SCU0 chamber alignment)

Harkay

Stored beam & injection

1100-1300

Accumulation limit measuresments

Sajaev

Stored beam & injection

1300-1500

Bus tie and test Booster dipole with master & slave on same transformer

Wang, Ju

No injection

1300-1400

X-ray BPM raw blade spectrum analysis

Lill/Hahne/Bui

Stored beam

1500-2000

Continue Accumulation limit measurements

Sajaev

Stored beam & injection

2000-2200

OPEN



2200-2400

Bring down injectors, slow shutdown of SR P.S. and RF in preparation for shutdown

MCR

No beam