Machine Studies
Schedule for Run01-3, 2013
February 12th 0800 - February 13th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, February 12, 2012 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1130 |
Test global open commands on IDs |
Smith |
No Beam |
0930-1130 |
Troubleshoot S38, RF Cav 2 ion gauge fault |
Gagliano |
No beam |
0930-1130 |
Test RF-5 local to remote transfer |
Horan |
No Injection |
0930-1130 |
Adjust klystron filament power on L1-L5 |
RF Group |
No Injection |
0930-1130 |
Troubleshoot IOCRF3HVPS beam loss |
Horan |
No Beam |
0930-1030 |
Troubleshoot SS1 wiring issue at 7BM. |
Banks |
No Beam |
0930-1130 |
Troubleshoot B:SD |
Puttkammer |
No Injection |
0930-1130 |
Take S25 temperature measurements |
Fors |
No Beam |
0930-1130 |
Take S25 CMPSI data |
Fors |
No Beam |
1130-1300 |
L1-L3 interlock testing |
Pietryla |
No Injection |
1300-1500 |
Linac training |
Oziemkowski/Obasohan/Pasky |
Limited Injection (Can allow SR Beam) |
1200-1300 |
Reboot IOCS to add skew quad FF PVs |
Xu |
No Beam |
1300-1500 |
Test feedback IOC upgrade (parallel to Linac training). |
Xu |
Stored Beam |
1500-1800 |
Test P0 feedback with an improved RF clock/P0 source. |
Yao |
Stored Beam & Injection |
1800-2400 |
IEX study. |
Xiao |
Stored Beam & Injection |
1800-2000 |
Measure BTS emittance (parallel to IEX study). |
Yao |
Limited Injection |
|
Wednesday, February 13, 2012 |
|
|
0000-0100 |
IEX study (continued). |
Xiao |
Stored Beam & Injection |
0100-0300 |
Optimize response matrix measurement speed. |
Sajaev |
Stored Beam & Injection |
0300-0700 |
Investigate dynamic aperture dependence on skew quadrupoles |
Sajaev |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |