Machine Studies

Draft Schedule for Run01-5, 2013

February 25 th 0800 – February 27th 0800



Time

Descriptions

Studiers

SR Status

 

Monday, February 25, 2012

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1000

Reboot interleaving DSPs

PS group

No Injection

0930-1000

RF waveguide switch from RF3 to RF2

RF Group

No Beam

0930-1030

Investigate Power Fail light on iocs25bpm

Laird

No Beam

0930-1130

Install new 352Mhz source

DiMonte/Yao

No Beam

0930-1130

Temp. measurements at S25

Fors

No Beam

0930-1130

Archive CMPSI data at S39

Fors

No Beam

0930-1300

Test IEX global ID commands

Smith

Stored beam (may cause BPLD trip)

0930-1330

RF5 cathode troubleshooting

RF Group

Limited Injection

1000-1100

Map Linac PC gun area

Pasky, et al

Access Linac

1030-1130

Replace fan tray in iocs17fb

Laird

No Beam

1300-1600

Test rtfb IOC upgrade

Xu

Stored Beam & Injection

1300-1500

Linac training (07-15). Parallel to IOC upgrade.

Oziemkowski/Obasohan

Limited Injection

1600-1900

Install new P0 feedback clock.

Yao Scaminaci

Stored Beam & Injection

1900-2100

Optimize booster injection controllaw.

Yao

Limited injection

2100-2200

Set up P0 feedback for hybrid.

Yao

Stored Beam & Injection

2200-2400

Orbit switch.

Xiao

Stored Beam & Injection

 

Tuesday, February 26, 2012

 

 

0000-0200

Orbit switch (continued).

Xiao

Stored Beam & Injection

0200-0600

IEX study.

Xiao

Stored Beam & Injection

0600-0900

Complete hybrid lattice setup.

Sajaev

Stored Beam & Injection

0900-1300

Local impedance measurement using RM.

Sajaev

Stored Beam & Injection

1300-1500

Linac training (07-15)

Oziemkowski/Obasohan

Limited injection

1500-1900

Test SCU0 heating with non-standard fill patterns.

Harkay Boon

Stored Beam & Injection

1900-2100

Test ADC delay scan script.

Sereno

Stored Beam & Injection

2100-2300

Collect 12 second FPGA data.

Sereno

Stored Beam & Injection

2300-2400

Sextupole offset measurement.

Xiao

Stored Beam & Injection

 

Wednesday, February 27, 2012

 

 

0000-0300

Sextupole offset measurement (continued).

Xiao

Stored Beam & Injection

0300-0630

Restore APS-U lattice and test SPX sextupole compensation.

Sajaev

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection