Machine Studies

Schedule for Run01-6, 2013

March 5th 0800 – March 6th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, March 05, 2013



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1030

Switchover pump 517 (S19&20)

Theres

No Beam

0930-1030

Switchover pump 529 (S31&32) 535 S37&38)

Theres

No Beam

0930-1130

Temperature measurements in S25

Fors

No Beam

0930-1130

Take CMPSI scope data

Fors

No Beam

0930-1130

Change S31&32 PID loops

Erwin

No Beam

0930-1300

Troubleshoot RF1 crowbar trips

RF Group

No Beam

0930-1300

Troubleshoot RF-5

RF Group

No Injection

1000-1200

Investigate repair 7-ID FE SS

Banks

Zone A Access

1300-1500

Test realtime feedback software with beam

S. Xu

Stored beam & inj.

1500-1700

investigate performance of the vertical P0 feedback

Yao

Stored beam & injection

1700-1800

Test adcDelay scan script

Sereno, Shang

Stored beam & Occ. Inj.

1800-2100

Acquire 12 sec. fpga bpm data for rf glitches and rtfb system running

Sereno

Stored beam & Occ. Inj.

1800-2000

Linac training (15-23)

Oziemkowski

Limited Injection

2100-2400

Sextupole offset study

Xiao

Stored beam & injection


Wednesday, March 06, 2013



0000-0300

Sextupole offset study (Continued)

Xiao

Stored beam & injection

0300-0700

APS upgrade lattice

Sajaev

Stored Beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection