Machine Studies
Draft Schedule for Run01-7, 2013
March 11th 0800 – March 13th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 11, 2012 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1130 |
Troubleshoot PAR RF #1 amplifier |
RF Group |
Limited Injection |
0930-1130 |
Troubleshoot AHU units VAV-422 & 423 |
Erwin/FMS |
No Beam |
0930-1130 |
Repair S2 BI amplifier |
Gold |
No Beam |
1000-1100 |
Document backscattering beam line |
Gagliano |
Access Zone F |
0930-1230 |
Troubleshoot RF-5 cathod voltage stability |
RF Group |
No Injection |
1030-1330 |
Remove skew quad hardware |
Bechtold |
Access Zone F Access Zone A-C |
1400-1700 |
test matlab-based beam history data acquisition |
C. Wang, Shang |
Stored beam & injection |
1700-2100 |
measure synchrotron tune of hybrid bunch train clusters. Hybrid fill |
Yao |
Stored beam & injection |
2100-2300 |
continue to investigate effect of P0 feedback settings on single bunch current limit. Hybrid lattice |
Yao |
Stored beam & injection |
2300-2400 |
Set-up RHB Lattice before orbit switch |
Xiao |
Stored beam & injection |
|
Tuesday, March 12, 2012 |
|
|
0000-0300 |
Set-up RHB Lattice before orbit switch (continued) |
Xiao |
Stored beam & injection |
0300-0700 |
Orbit switch |
Xiao |
Stored beam & injection |
0700-0900 |
BPM rack temperature testing |
Erwin |
Stored beam & injection |
0900-1100 |
test realtime feedback software with beam |
S. Xu |
Stored beam & injection |
1100-1200 |
Investigate orbit motion caused by 14-ID gaps opening/closing |
Schroeder |
Stored beam & injection |
1200-1600 |
Step response measurment using S38 fast correctors |
Sereno |
Stored beam & injection |
1500-1700 |
Linac training (15-23) |
Obasohan |
Limited Injection |
1600-1700 |
test matlab-based beam history data acquisition (single bunch |
C. Wang |
Stored beam |
1700-2100 |
sextupole offset measurement. |
Xiao |
Stored beam & injeciton |
2100-2400 |
IEX study |
Xiao |
Stored beam & injection |
|
Wednesday, March 13, 2012 |
|
|
0000-0100 |
IEX study (continued) |
Xiao |
Stored beam & injection |
0100-0630 |
Measure local impedance |
Harkay |
Stored beam & injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |