Draft Schedule for Run01-8, 2013
March 19th 0800 – March 20th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, March 19, 2013 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Steer 12-ID away from BPLD limits &Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-0930 |
Test RTFB reboot procedure on canted undulator sectors |
Schroeder |
Stored Beam & Injection |
0930-1000 |
Reboot interleaving PS DSPs |
PS Group |
No Injection |
0930-1000 |
Shutdown AHU 5018 for S37 &38 |
Erwin/FMS |
No Beam |
0930-1030 |
Waveguide switch from RF3 to RF2 |
RF Group |
No Beam |
0930-1130 |
PID adjustments S31&32 |
Erwin/FMS |
No Beam |
0930-1130 |
Reboot FPGA based bpm IOCs |
Pietryla |
No Beam |
0930-1130 |
Investigate S28B:Q4 readback |
Puttkammer |
No Beam |
0930-1130 |
Remove 1A:H4/V4 Converters for skew conversion testing |
Puttkammer |
No Beam |
0930-1130 |
Linac training (07-15) |
Oziemkowski |
Limited Injection |
1000-1100 |
Replace defective encoder at S23 |
Merritt |
Access Zone D |
1000-1200 |
New modulator module installation and measurement study at RF2 |
RF Group |
No Beam |
1200-1300 |
Setup S38A:P2 and S38A:P4 for X only and Y only mode in 324 bunches |
Sereno |
Stored beam |
1300-1700 |
upgrade P0 feedback firmware fixing the sample clock phase jump problem and test with beam |
Yao |
Stored beam & injection |
1700-1800 |
take bunch train synchrotron spectrum of hybrid fill |
Yao |
Stored beam & injection |
1800-2400 |
Sextupole offset measurements |
Xiao |
Stored beam & injection |
|
Wednesday, March 20, 2013 |
|
|
0000-0200 |
Linac training (23-07) |
Obasohan |
Limited Injection |
0200-0700 |
SCU0 study (vary bunch patterns) |
Harkay |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |