Draft Schedule for Run02-10, 2013
July 30th 0800 – July 31st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, July 30, 2013 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1130 |
Install fan control system in S3 |
Erwin |
No Beam |
0930-1030 |
test the upgrade of iocs40fb with beam |
S. Xu |
Stored beam |
0930-1130 |
Replace RF5's control buffer card #7 |
RF Group |
No Injection |
0930-1100 |
Update Linac reference files |
Pasky |
Limited injection |
1100-1200 |
Linac training |
Pasky/Angel |
Limited Injection |
1200-1400 |
SCU0 quench test (using a beam dump) with ideal ID steering. 100 mA in 24 bunches. |
Harkay |
Stored beam & injection |
1400-1500 |
test new SR scope configure for SR injection |
Yao |
Stored beam & injection |
1500-1700 |
center BTS trajectory through the quads. booster beam and injection |
Yao |
Stored beam & injection |
1700-2200 |
Reference lattice study |
Emery |
Stored beam & injection |
2200-2400 |
high beta function study |
Xiao |
Stored beam & injection |
|
Wednesday, July 31, 2013 |
|
|
2400-0200 |
high beta function study (continued) |
Xiao |
Stored beam & injection |
0200-0700 |
continue 3NLSS lattice |
Sajaev |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |