Machine Studies

Schedule for Run02-11, 2013

August 6th 0800 – August 7st 0800



Time

Descriptions

Studiers

SR Status


Tuesday, August 6, 2013



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1130

Repair of the RF4 Crowbar Vesda SystemI

Trento

No Beam

0930-1130

update linac file and improve PEM performance

Pasky

Limited injectoin

0930-1030

Replace S31 Ion pump controller

Gagliano

No Beam

0930-1130

investigate the fuse issue with B:SD power supply

J. Wang

No injection

1130-1230

Linac training

Pasky/Angel

Limited injection

1130-1330

Investigate noisy readback problem with the RF5 UVC power supply

Trento

No injection

1330-1600

SCU0 quench study, x steering

Harkay

Stored beam & injection

1600-1800

continue BTS Quads center/BPM offset study

Yao/Shang

Stored beam & injection

1800-2000

check and tune the performance of VSA-based chromaticity measurement script.

Yao/Shang

Stored beam & injection

2000-2400

Auto Aperture Scan Script Test

Xiao/Shang

Stored beam & injection


Wednesday, August 7, 2013



0000-0600

Setup optics for next machine start up

Xiao

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection