Machine Studies
Schedule for Run02-11, 2013
August 6th 0800 – August 7st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, August 6, 2013 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1130 |
Repair of the RF4 Crowbar Vesda SystemI |
Trento |
No Beam |
0930-1130 |
update linac file and improve PEM performance |
Pasky |
Limited injectoin |
0930-1030 |
Replace S31 Ion pump controller |
Gagliano |
No Beam |
0930-1130 |
investigate the fuse issue with B:SD power supply |
J. Wang |
No injection |
1130-1230 |
Linac training |
Pasky/Angel |
Limited injection |
1130-1330 |
Investigate noisy readback problem with the RF5 UVC power supply |
Trento |
No injection |
1330-1600 |
SCU0 quench study, x steering |
Harkay |
Stored beam & injection |
1600-1800 |
continue BTS Quads center/BPM offset study |
Yao/Shang |
Stored beam & injection |
1800-2000 |
check and tune the performance of VSA-based chromaticity measurement script. |
Yao/Shang |
Stored beam & injection |
2000-2400 |
Auto Aperture Scan Script Test |
Xiao/Shang |
Stored beam & injection |
|
Wednesday, August 7, 2013 |
|
|
0000-0600 |
Setup optics for next machine start up |
Xiao |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |