Draft Schedule for Run02-3, 2013
June 11th 0800 - June 12th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, June 11, 2013 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1030 |
Patch non production RTFB IOC |
Arnold |
Stored Beam & Injection |
0930-1130 |
Investigate S33B:Q4 temperature readback |
Puttkammer |
No Beam |
0930-1130 |
Troubleshoot L1 temperature trips |
Horan |
No Injection |
0930-1130 |
Verify/compare that the CPU power supply is operating within specifications. |
Puttkammer |
No injection |
0930-1030 |
Check power level at L3 DMU |
Jefferson |
No injection |
0930-1130 |
hook up a scope and monitor SR sector 36 converter cabinet 3 Gespac power supply |
Putkammer |
No Beam |
0930-1130 |
Remove the external diagnostics in BES2 |
Goetzen |
No Injection |
1000-1100 |
Replace iocs15fb MVME5100 CPU |
Laird |
No Beam |
1200-1215 |
End to end test at 10BM |
SI group |
No Beam |
1200-1230 |
Recover SR systems |
OPS |
Stored Beam & Injection |
1230-1800 |
Continue CPU correction |
Xiao |
Stored Beam & Occ. Inj. |
1230-1330 |
PAR training (07-15) |
Obasohan |
Limited Injection |
1330-1600 |
check PAR extraction and scan kicker timing |
Yao |
Limited Injection |
1600-1800 |
test a new PTB lattice |
Sereno/Yao |
Occ. Inj. possible |
1800-2200 |
bpm commissioning, noise studies, and gap scans |
Decker |
Stored beam & inj. |
2200-2400 |
Accumulation limit measurement |
Sajaev |
Stored beam & inj. |
|
Wednesday, June 12, 2013 |
|
|
0000-0300 |
Accumulation limit measurement (continued) |
Sajaev |
Stored beam & inj. |
0300-0700 |
APS-U lattice setup |
Sajaev |
Stored beam & inj. |
0700-0800 |
Prepare for User beam |
OPS |