Machine Studies
Draft Schedule for Run02-4, 2013
June 18th 0800 - June 19th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, June 18, 2013 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1130 |
measure and match PAR kicker scope signal cables |
Yao/Gold/ Hillman |
No Par beam |
0930-1130 |
Replace Gespac in S36 cabinet 3 |
Puttkammer |
No Beam |
0930-1130 |
Troubleshoot S26A:P2, A:P3 (May require a reboot of iocs25bpm) |
Keane |
No beam |
0930-1130 |
CPU characterization |
Deriy |
No Beam |
0930-1200 |
Troubleshoot L1:RG1:QM4 |
Hillman |
No injection |
0930-1300 |
Troubleshoot L1 temperature trips (K1 down mode) |
Horan |
No Injection |
1000-1130 |
Replace S37 Cavity #4 downstream IR cable |
Morrison |
Access Zone F |
1130-1330 |
continue PAR kicker timing scan and optimization |
Yao/Harkay |
Par Beam only |
1130-1200 |
Restore SR systems |
OPS |
Stored Beam & Injection |
1200-1400 |
MIA optics correction study (single bunch - low current) |
Wang, C |
Stored beam |
1330-1400 |
Switch Linac back to K3 down mode |
OPS |
No injection |
1400-1800 |
BPM studies |
Decker/Sereno/ Sun |
Stored beam & injection |
1400-1800 |
Gas bremsstrahlung radiation in 35-ID during a 24-bunch pattern (parasitic 2 hours to fit BPM studies schedule) |
Dooling/Yang |
Stored beam & injection |
1800-2000 |
IEX studies (324 singlets) |
Xiao |
Stored beam & injection |
2000-2400 |
scraper test set-up (24 singlets + scraper condition). |
Xiao |
Stored beam & injection |
|
Wednesday, June 19, 2012 |
|
|
0000-0300 |
Local impedance measurements |
Sajaev |
Stored beam & injection |
0300-0400 |
APS-U lattice setup |
Sajaev |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |