Machine Studies

Draft Schedule for Run02-5, 2013

June 24th 0800 - June 26th 0800



Time

Descriptions

Studiers

SR Status


Monday, June 24, 2013



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1030

Linac training

Angel/Pasky

Limited injection

1030-1600

Set up hybrid lattice

Sajaev

Stored Beam & Injection

1200-1400

Set-up P0 feedback (to be co-ordinated with Sajaev)

Yao

Stored beam &

1600-2000

Orbit recovery

Xiao

Stored beam & injection

1600-2000

study operational changes to RG2 (parasitic to orbit recovery)

Sereno

Occ. Inj. possible

2000-2400

Scraper test

Xiao

Stored beam & injection


Tuesday, June 25, 2012



0000-0300

SCU quench studies

Harkay/ Andrea

Stored beam & occ. injection

0300-0800

Measure accumulation limit on reference orbit

Emery/ Harkay

Stored beam & injection

0800-1000

S26AQ5 converter glitch repair

Puttkammer

No Beam

0900-1030

Test CPU correctors

Deriy

No Beam

0800-1000

Match PAR kicker scope signal cables

Yao, Hillman

No impact

0800-1000

Add event link transmitter at S39 (input to iocmtime down)

Laird

No Beam, No Injection

0800--1000

Waveguide switch from RF3 to RF2

RF Group

No beam

0830-0900

Turn off SCU0 fans

Kasa

Access Zone A

0830-0930

Inspect S37 scraper

Xiao, Hoyt, et al

Access Zone F

0830-0930

Repair BSS D2

Belcher

Access Zone D

0830-1030

Test RTFB reflective memory module at S37

Laird

No Beam

0830-0930

Remove 10-BM PLC monitor

Bombard

No Beam

1000-1100

Switch back to L1 to support gun operations. Also make new files.

Pasky

No injection

1030-1100

Restore SR systems

OPS

Stored Beam & Injection

1100-1200

Linac training (07-15)

Angel/Pasky

Limited injection

1200-1600

Continue 3NLSS Lattice set-up

Sajaev

Stored Beam & injection

1600-2000

optimize booster beam with 325MeV energy.

Yao

Limited injection

2000-2400

Set up lattice with large betaX at injection

Xiao/Emery

Stored beam & injection


Wednesday, June 26, 2012



0000-0200

Set up lattice with large betaX at injection (continued)

Xiao/Emery

Stored beam & injection

0200-0700

Set up test lattice for alternative spx cavity

Sajaev

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection