Machine Studies

Draft Schedule for Run02-9, 2013

July 22th 0800 – July 24th 0800



Time

Descriptions

Studiers

SR Status


Monday, July 22, 2013



0800-0810

Collect XBPM orbit data

OPS

Stored beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1200

Measure 5V Gespac power supplies in Zones F, A & B

Puttkammer

No Beam

0930-1030

Install an IOC in Rack 39-04

Arnold

No impact

0930-1030

RF waveguide switch RF2 to RF3

RF Group

No Beam

0930-1200

Replace and test RF4's crowbar Vesda

RF Group

No beam

1030-1200

Linac training (07-15)

Angel

Limited Injection

1200-1400

Injector training (07-15)

Obasohan

Limited Injection

1400-1600

optimize SR injection efficiency of booster 375 MeV lattice and test BTS controllaw

Yao

Stored beam & injection

1600-2000

RHB lattice setup

Sajaev

Stored beam & injection

2000-2400

Orbit switch

Xiao

Stored beam & injection


Tuesday, July 23, 2013



0000-0600

Accumulation limit with increased betaX

Xiao

Stored beam & injection

0600-0800

test the upgrade of iocs40fb

with beam

S. Xu

Stored beam & injection

0800-1000

SCU0 steering tests

Harkay

Stored beam

0800-0930

Injector training (07-15)

Obasohan

Limited Injection

0930-1100

Linac training (07-15)

Angel

Limited Injection

1100-1200

check P0 timing relative to bucket#0 with scope signal after a new injection from zero

Yao, Scaminaci.

Stored beam & injection

1200-1800

Accumulation limit with and without P0 feedback

Sajaev, Yao

Stored beam & injection

1800-2400

Accumulation limit on reference orbit

Emery

Stored beam & injection


Wednesday, July 24, 2013



0000-0600

Vertical bump studies in 3NLSS lattice

Sajaev

Stored beam & injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection