Machine Studies

Schedule for Run03-1, 2013

September 24th 0800 – October 1st 0800

Time

Descriptions

Studiers

SR Status


Tuesday, September 24, 2013



1000-1400

BPLD validation.

Bui

Stored Beam & Injection

1400-1800

X-ray BPM checkout.

Hahne

Stored Beam & Injection

1500-1700

Injector training (parallel to x-ray bpm checkout).

Angel

Limited Injection

1800-2400

Initial BPM checkout.

Decker

Stored Beam & Injection


Wednesday, September 25, 2013



0000-0600

Orbit recovery.

Xiao

Stored Beam & Injection

0600-1200

ID steering and orbit clean-up.

Sajaev

Stored Beam & Injection

1200-1500

SCU0 quench studies (SCU0 off).

Harkay Doose Dooling

Stored Beam & Injection

1500-1700

Test MXA/VSA tune measurement.

Yao Shang

Stored Beam & Injection

1500-1700

Set-up S35 pinhole camera and bunch purity system

Yang

Stored Beam -- No injection

1700-1900

SCU0 beam-based alignment and ID steering.

Harkay

Stored Beam & Injection

1900-2400

CPU setup 1.

Xiao

Stored Beam & Injection

1900-2000

SCU0 skew quad feedforward checkout (parallel to CPU setup).

Harkay


2000-2200

Injector training (15-23) (parallel to CPU setup).

Angel

Limited Injection


Thursday, September 26, 2013



0000-0300

CPU setup 1 (continued).

Xiao

Stored Beam & Injection

0300-0800

Explore on-axis injection in small DA lattice.

Emery

Stored Beam & Injection

0800-1200

PSS shutter checkouts

SI group

No Beam

0800-0900

Replace and calibrate DCCT DVM (SR RF systems need to be off)

Rob Keane

No Beam

0800-0900

Troubleshot iocrfmon &iocrf5hvps (RF5 need to be off in anticipation of waveguide switch))

DiMonte

No Beam

0800-0830

Reboot interleaving DSPs

PS Group

No injection

0800-1100

Inspect turbo upmp system on SCU0.

Hasse

Access Zone A

0830-1130

Verify survey mounts

Penicka

Access Zone C

0900-1000

RF waveguide switch

RF Group

No Beam

1000-1100

Check SR Flags

Berg

No beam

1130-1200

Recover SR systems

Ops

Stored Beam & Injection

1200-1600

Test new skew quads.

Emery Sajaev Sun

Stored Beam & Injection

1200-1400

Injector training (07-15) (parallel to test new skew quads).

Obasohan

Limited Injection

1600-1800

Install new firing card and test.

Yao Wang

Limited injection

1800-2400

Intermediate BPM checkout.

Decker

Stored Beam & Injection

2 hrs

Injector training (15-23) (parallel to BPM checkout if possible)

Angel

Limited Injection


Friday, September 27, 2013



0000-0600

Lattice setup.

Sajaev

Stored Beam & Injection

0600-1330

CPU setup 2.

Xiao

Stored Beam & Injection

0800-1000

Injector training (07-15) (parallel to CPU work).

Obasohan

Limited Injection

1000-1100

Set up SD ramp after PS change (parallel to CPU).

Yao

Limited injection

1330-1400

Switch back to RF4 from RF1

RF Group

No beam

1400-1700

SCU quench studies.

Harkay Xiao Doose Dooling

Stored Beam & Injection

1700-2000

Optics correction with FPGAs.

Wang

Stored Beam & Injection

1700-1900

Injector training (15-23) (parallel to FPGA studies).

Angel

Limited Injection

2000-2200

Set up 6 GeV booster extraction.

Yao

Limited injection

2200-2400

IEX checkout.

Xiao

Stored Beam & Injection


Saturday, September 28, 2013



0000-0400

IEX checkout.

Xiao

Stored Beam & Injection

0400-1000

OPEN



1000-1800

SCU0 radiation heating measurements.

Boon Harkay

Stored Beam & Injection

1800-2400

OPEN




Sunday, September 29, 2013



0000-0800

OPEN



0800-1600

SCU0 radiation heating measurements.

Boon Harkay

Stored Beam & Injection

1800-2000

SR requalifications

Schroeder/ Ronzhin/ Christensen

Stored beam & injection

2000-2400

Topup test run

OPS

Stored Beam & Injection


Monday, September 30, 2013



0000-0400

Topup test run

OPS

Stored Beam & Injection

0400-0800

PAR high charge test.

Yao Chae

Stored Beam & Injection

0800-1400

Final BPM checkout.

Decker

Stored Beam & Injection

1400-1800

Smith predictor in sddscontrollaw.

Emery Shang

Stored Beam & Injection

1800-2200

Injection limit on reference orbit.

Emery Lindberg

Stored Beam & Injection

2200-2400

SCU0 quench studies (SCU0 off).

Harkay Doose Dooling

Stored Beam & Injection


Tuesday, October 01, 2013



0000-0100

SCU0 quench studies (SCU0 off), continued.

Harkay Doose Dooling

Stored Beam & Injection

0100-0600

OPEN



0600-0800

Prepare for user Operations (24 singlets – Top-Up RHB)

Ops

Stored Beam & Injection