Machine Studies
Draft Schedule for Run03-12, 2013
December 17th 0000 – December 18th 0000
Time | Descriptions | Studiers | SR Status |
| Tuesday, December 17, 2013 |
|
|
0000-0010 | Collect XBPM orbit data | OPS | Stored Beam & Injection |
0010-0200 | SR training | Obasohan | Stored Beam & Injection |
0200-0700 | SCU0 steering study | Harkay | Stored Beam & Injection |
0700-0900 | PAR fundamental trip investigation | Yao/Horan | No Beam |
0800-0900 | RF waveguide switch monitor RF-3 | RF Group | No Beam |
0900-1100 | Booster sextupole current ramp script test | Yao/Shange | No Beam |
0700-1100 | Investigate IEX BPLD failure | Deriy | No Beam |
1100-1300 | Tweak RF-3 for operations (as needed) | RF Group | Stored Beam & Injection |
1300-1500 | Injector training | Angel | Limited Injection |
1300-2200 | Prepare optics for next APS start up | Xiao | Stored Beam & Injection |
2200-2400 | Slow Shutdown | OPS | No Beam |