Machine Studies

Draft Schedule for Run03-12, 2013

December 17th 0000 – December 18th 0000

Time

Descriptions

Studiers

SR Status

 

Tuesday, December 17, 2013

 

 

0000-0010

Collect XBPM orbit data

OPS

Stored Beam & Injection

0010-0200

SR training

Obasohan

Stored Beam & Injection

0200-0700

SCU0 steering study

Harkay

Stored Beam & Injection

0700-0900

PAR fundamental trip investigation

Yao/Horan

No Beam

0800-0900

RF waveguide switch monitor RF-3

RF Group

No Beam

0900-1100

Booster sextupole current ramp script test

Yao/Shange

No Beam

0700-1100

Investigate IEX BPLD failure

Deriy

No Beam

1100-1300

Tweak RF-3 for operations (as needed)

RF Group

Stored Beam & Injection

1300-1500

Injector training

Angel

Limited Injection

1300-2200

Prepare optics for next APS start up

Xiao

Stored Beam & Injection

2200-2400

Slow Shutdown

OPS

No Beam