Draft Schedule for Run03-2, 2013

October 8th 0800 – October 9th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, October 8, 2013



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1000

Switch to back up from pump 517

Theres

Affected PS at zero

0930-1000

Reboot vp iocs

Xu

No Beam

0930-1030

Modify L1 modulator control program

Trento

No Injection

0930-1030

Power cycle S29 ion pump controller

Zientek

No Beam

0930-1130

PS script testing in Zone B

Fors

No Beam

0930-1130

Swap S21C:BM PS

Puttkammer

No Beam

0930-1130

Inspect Linac RTD hardware

Cours

Limited Injection

0930-1130

Add diagnostics software to iocs31fb

Lenkszus

No Beam

1000-1030

Accelerating structure measurements

Smith, T.

Access Linac

1000-1100

Replace S37/C1 IR detector

Morrison

Access Zone F

1130-1200

Recover stored beam

OPS

Stored beam & inj.

1200-1300

SR requalification

Fystro/ Schroeder

Stored beam & inj.

1300-1400

Take FPGA data sets

Sereno

Stored beam & inj.

1300-1500

6 GeV booster beam setup

Yao

No injection

1500-1900

high charge booster beam study.

Yao/Chae

No injection

1900-2200

Injecting into small aperature

Emery/Sun, Y.

Stored beam & inj.

2200-2400

Single bunch current limit

Emery/ Lindberg

Stored beam & injection


Wednesday, October 9, 2013



0000-0100

Single bunch current limit

Emery/ Lindberg

Stored beam & injection

0100-0700

TBD

Xiao

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection