Machine Studies
Draft Schedule for Run03-2, 2013
October 8th 0800 – October 9th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, October 8, 2013 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1000 |
Switch to back up from pump 517 |
Theres |
Affected PS at zero |
0930-1000 |
Reboot vp iocs |
Xu |
No Beam |
0930-1030 |
Modify L1 modulator control program |
Trento |
No Injection |
0930-1030 |
Power cycle S29 ion pump controller |
Zientek |
No Beam |
0930-1130 |
PS script testing in Zone B |
Fors |
No Beam |
0930-1130 |
Swap S21C:BM PS |
Puttkammer |
No Beam |
0930-1130 |
Inspect Linac RTD hardware |
Cours |
Limited Injection |
0930-1130 |
Add diagnostics software to iocs31fb |
Lenkszus |
No Beam |
1000-1030 |
Accelerating structure measurements |
Smith, T. |
Access Linac |
1000-1100 |
Replace S37/C1 IR detector |
Morrison |
Access Zone F |
1130-1200 |
Recover stored beam |
OPS |
Stored beam & inj. |
1200-1300 |
SR requalification |
Fystro/ Schroeder |
Stored beam & inj. |
1300-1400 |
Take FPGA data sets |
Sereno |
Stored beam & inj. |
1300-1500 |
6 GeV booster beam setup |
Yao |
No injection |
1500-1900 |
high charge booster beam study. |
Yao/Chae |
No injection |
1900-2200 |
Injecting into small aperature |
Emery/Sun, Y. |
Stored beam & inj. |
2200-2400 |
Single bunch current limit |
Emery/ Lindberg |
Stored beam & injection |
|
Wednesday, October 9, 2013 |
|
|
0000-0100 |
Single bunch current limit |
Emery/ Lindberg |
Stored beam & injection |
0100-0700 |
TBD |
Xiao |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |