Machine Studies
Schedule for Run03-4, 2013
October 22nd 0800 - October 23rd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, October 22, 2013 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/OPS |
Stored Beam & Injection |
0930-1030 |
Waveguide switch from RF-2 to RF-3 |
RF Group |
No Beam |
0930-1030 |
Change MPC#1 in Sector 29 Relay Rack |
Martens |
No Beam |
0930-1130 |
S1/2 process water pump investigation |
Wright |
No Beam |
0930-1130 |
Replace ion pump controllers in booster cavities. |
Martens |
No beam |
1000-1130 |
Add capacitors to Linac L1 RTD junction box |
RF Group |
No Injection |
1000-1130 |
Apply thermocouples to RF Gun dumps |
PS & Vac Groups |
Access Linac |
1130-1200 |
Recover injectors and SR |
OPS |
Stored Beam & Injection |
1200-1400 |
Take FPGA and RTFB data. |
Sereno |
Stored Beam & Injection |
1200-1300 |
Troubleshoot S27B:P0 bpm (parallel to FPGA studies). |
Erwin |
Stored Beam & Injection |
1200-1400 |
Injector training (parallel to FPGA studies). |
Angel |
Limited injection |
1400-1500 |
Test four-corrector bump for RTFB tests. |
Sereno |
Stored Beam & Injection |
1500-1600 |
Test MXA-based SR tune measurement. |
Yao Shang |
Stored Beam & Injection |
1600 |
Inject 324 bunches |
OPS |
|
1600-2000 |
Booster high-charge studies. |
Yao Chae |
Stored Beam & Injection |
1600-2000 |
CPU studies |
Xiao |
Stored beam |
2000-2200 |
Install new BPM offsets |
Xiao |
Stored Beam & Injection |
2000-2200 |
Injector training (parallel to BPM offsets). |
Oobasohan |
Limited Injection |
2200-2400 |
Single bunch accumulation limit in reference lattice. |
Emery Lindberg |
Stored Beam & Injection |
|
Wednesday, October 23, 2013 |
|
|
0000-0200 |
Single-bunch accumulation limit (continued). |
Emery Lindberg |
Stored Beam & Injection |
0200-0700 |
Set up hybrid-mode lattice. |
Sajaev |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |