Machine Studies

Schedule for Run03-5, 2013

October 28th 0800 – October 30 th 0800

Time

Descriptions

Studiers

SR Status


Monday, October 28, 2013



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0930-1030

Troubleshoot RTFB data collection IOC

Arnold

No Beam

0930-1030

Rewire temp. controller in rack 27-04

Erwin

No Beam

0930-1030

Replace RTD in S3

Diag

No Beam

0930-1030

Install amplifier software support at RF-1

DiMonte

No Beam

0930-1130

PS script testing

Fors

No Beam

0930-1130

Troubleshoot S1-2 processed water pump trips.

MOM/FMS

No beam

0930-1130

RF gun characterization

Pasky

No Injection

0930-1130

Switch to PAR RF1 system #1 and test

Middendorf

No Injection

0930-1230

RF-3 cathode emission test

RF Group

No Beam

1000-1030

3ID end to end test

Bombard

No Beam

1000-1100

Troubleshoot S27B:P0

Erwin

Access Zone D

1000-1200

Troubleshoot HET stop

Belcher

Access Booster

1300-1400

Test PAR beam after RF1 switch.

Yao

Limited Injection

1400-1800

Accumulation limit in reference lattice.

Emery Lindberg

Stored Beam & Injection

1800-2200

Set up hybrid lattice.

Sajaev

Stored Beam & Injection

1800-1900

Set up P0 feedback for hybrid operation.

Yao

Stored Beam & Injection

1900-2100

Injector training (15-23) (parallel to hybrid lattice setup).

Angel

Limited Injection

2200-2400

Orbit switch.

Xiao

Stored Beam & Injection


Tuesday, October 29, 2013



0000-0200

Orbit switch (continued).

Xiao

Stored Beam & Injection

0200-0600

Add X bump for SCU protection.

Xiao

Stored Beam & Injection

0600-0900

Measure P5 offsets.

OPS

Stored Beam & Injection

0900-1000

SR requalification.

LaBuda

Stored Beam & Injection

1000-1200

RF gun characterization (07-17)

Pasky

No Injection

1000-1200

Check S4B:P1 with beam

Sereno/ Erwin

Stored beam

1200-1400

Install P5 offsets, adjust P3-P4 offsets

Sajaev

Stored Beam & Injection

1400-1600

Try full coupling operation

Sajaev

Stored Beam & Injection

1600-1700

SR requalification.

Fystro

Stored Beam & Injection

1700-2000

Test turn-by-turn based optics correction.

Wang

Stored Beam & Injection

1700-1900

Injector training (15-23) (parallel to turn-by-turn) studies.

Angel

Limited Injection

2000-2400

On-axis injection optimization

Emery Sun

Stored Beam & Injection


Wednesday, October 30, 2013



0000-0600

High-charge injector studies.

Yao

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection