Schedule for Run03-6, 2013

November 5th 0800 – November 6tht 0800

Time

Descriptions

Studiers

SR Status

 

Tuesday, November 5, 2013

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0930-1000

Reboot interleaving DSPs

PS Group

Limited Injection

0930-1000

Reboot iocmcr

Xu

Stored Beam & Injection

0930-1000

PSS end to end tests 16ID & BM

Boron

No Beam

0930-1030

Install P0 feedback amplifier

Yao, Gold

No Beam

0930-1130

Hook up external monitoring in S15

Wang

No Beam

0930-1130

Troubleshoot S13B:S3

Puttkammer

No Beam

0930-1230

RF3 cathode emissions tests

Horan

No Beam

0930-1330

PAR RF1 work and switch

Middendorf

Limited Injection

0930-1330

Install electronic hardware for PAR RF12 circulator

RF Group

Limited Injection

1000-1100

Replace L1 water station relief valve

Wright

Access Linac

1230-1330

Waveguide switch from RF3 to RF2

RF Group

No Beam

1000-1200

Test SCU0 controls.

Harkay

No beam

1330-1400

Recover SR operation.

OPS

Stored Beam & Injection

1400

Inject SR beam.

OPS

Stored Beam & Injection

1400-1600

Test linac operation at higher repetition rates.

Pasky

No injection

1400-1500

Test 4-corrector bump in S27 (parallel to the gun studies).

Sereno

Stored beam

1500-1600

Measure betatron tune stability (parallel to the gun studies).

Wang

Stored beam

1600-2000

Set up hybrid lattice.

Sajaev, Yao, Emery

Stored Beam & Injection

2000-2400

High-charge booster study.

Yao

No injection

 

Wednesday, November 6, 2013

 

 

0000-0400

Injection study with small aperture.

Emery Sun

Stored Beam & Injection

0400-0700

Test of injection with high coupling.

Xiao

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection