Machine Studies
Schedule for Run03-6, 2013
November 5th 0800 – November 6tht 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, November 5, 2013 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/OPS |
Stored Beam & Injection |
0930-1000 |
Reboot interleaving DSPs |
PS Group |
Limited Injection |
0930-1000 |
Reboot iocmcr |
Xu |
Stored Beam & Injection |
0930-1000 |
PSS end to end tests 16ID & BM |
Boron |
No Beam |
0930-1030 |
Install P0 feedback amplifier |
Yao, Gold |
No Beam |
0930-1130 |
Hook up external monitoring in S15 |
Wang |
No Beam |
0930-1130 |
Troubleshoot S13B:S3 |
Puttkammer |
No Beam |
0930-1230 |
RF3 cathode emissions tests |
Horan |
No Beam |
0930-1330 |
PAR RF1 work and switch |
Middendorf |
Limited Injection |
0930-1330 |
Install electronic hardware for PAR RF12 circulator |
RF Group |
Limited Injection |
1000-1100 |
Replace L1 water station relief valve |
Wright |
Access Linac |
1230-1330 |
Waveguide switch from RF3 to RF2 |
RF Group |
No Beam |
1000-1200 |
Test SCU0 controls. |
Harkay |
No beam |
1330-1400 |
Recover SR operation. |
OPS |
Stored Beam & Injection |
1400 |
Inject SR beam. |
OPS |
Stored Beam & Injection |
1400-1600 |
Test linac operation at higher repetition rates. |
Pasky |
No injection |
1400-1500 |
Test 4-corrector bump in S27 (parallel to the gun studies). |
Sereno |
Stored beam |
1500-1600 |
Measure betatron tune stability (parallel to the gun studies). |
Wang |
Stored beam |
1600-2000 |
Set up hybrid lattice. |
Sajaev, Yao, Emery |
Stored Beam & Injection |
2000-2400 |
High-charge booster study. |
Yao |
No injection |
|
Wednesday, November 6, 2013 |
|
|
0000-0400 |
Injection study with small aperture. |
Emery Sun |
Stored Beam & Injection |
0400-0700 |
Test of injection with high coupling. |
Xiao |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |