Machine Studies
Schedule for Run03-7, 2013
November 11th 0800 – November 13th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, November 11, 2013 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/ OPS |
Stored Beam & Injection |
0930-1030 |
Test user operations PEM |
Schroeder/ Shang |
No Beam |
0930-1030 |
Enter RF5 klystron garage to do some measurements. |
Horan |
No beam |
0930-1130 |
PS script testing Zone C |
Fors |
No Beam |
0930-1130 |
Investigate comm loss between iocs35das & iocs35fb |
Lenkszus |
No Beam |
0930-1130 |
Check input transformer tap for BQD |
Wang |
Limited Injection |
0930-1130 |
Move external monitors |
Wang |
No Beam |
0930-1300 |
Install PAR RF12 circulator |
RF Group |
No Injection |
0930-1730 |
Water tie in at S35BM |
Wyncott |
35BM offline |
1000-1100 |
Troubleshoot xbpm at 34BMP1 |
Hahne |
Zccess Zone E |
1000-1300 |
Verify 35ID wiring / 35BM work |
McNamara / Friedman |
Access Zone F |
1330-1430 |
Test RF PEMs |
Schroeder / Soliday |
No Beam |
1330-1630 |
Verify klystron water readbacks |
RF Group |
Stored Beam & Injection |
1430-1500 |
Recover SR beam. |
OPS |
Stored Beam & Injection |
1500-1600 |
SR requalification. |
Bogdan |
Stored Beam & Injection |
1600-1700 |
S27 orbit bump test for RTFB. |
Sereno |
Stored Beam & Injection |
1700-2100 |
High-charge injector study. |
Yao |
Limited injection |
2100-2400 |
Set up RHB lattice. |
Sajaev |
Stored Beam & Injection |
|
Tuesday, November 12, 2013 |
|
|
0000-0100 |
Set up RHB lattice (continued). |
Sajaev |
Stored Beam & Injection |
0100-0500 |
Orbit switch. |
Xiao |
Stored Beam & Injection |
0500-0900 |
Test injection with high coupling. |
Xiao |
Stored Beam & Injection |
0700-0900 |
Injector training if possible (parallel to high coupling injection). |
Angel |
Limited injection |
0900-1100 |
FPGA optics correction test. |
Wang |
Stored Beam & Injection |
0900-1100 |
Investigate Booster QD correction (parallel to FPGA). |
Yao |
Limited injection |
1100-1900 |
Perform ID gap scans. |
Sereno |
Stored Beam & Injection |
1900-2300 |
Xray BPM alignment. |
Hahne |
Stored Beam & Injection |
2300-2400 |
Search for possible vertical aperture restriction in SR. |
Emery |
Stored Beam & Injection |
|
Wednesday, November 13, 2013 |
|
|
0000-0300 |
Search for possible vertical aperture restrictions in SR (continued). |
Emery |
Stored Beam & Injection |
0000-0200 |
Injector training (parallel to aperture search). |
Obasohan |
Limited Injection |
0300-0700 |
Injection tune up software development. |
Sajaev |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |