Machine Studies
Draft Schedule for Run01-1, 2014
January 21st 0800 – January 28th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, January 21, 2014 |
|
|
0800-1200 |
BPLD validations |
Bui |
Stored beam & injection |
1200-1600 |
X-ray BPM checkout |
Hahne |
Stored beam & Occ. inj. |
1300-1500 |
Linac training (07-15) parasitic to X-ray BPM checkout |
Frazier |
Limited Injection |
1600-2200 |
Initial BPM checkout |
Sereno |
Stored beam & injection |
2200-2400 |
100 mA 24 bunches, ID28 bump study with SCU0 beam losses during beam dumps
|
Xiao/Harkay/ Dooling |
Stored beam & injection |
|
Wednesday, January 22, 2014 |
|
|
0000-0200 |
100 mA 24 bunches, ID28 bump study with SCU0 beam losses during beam dumps
|
Xiao/Harkay/ Dooling |
Stored beam & injection |
0200-0800 |
100 mA 24 bunches, Orbit recovery with BPM offset measurement S25-28
|
Xiao |
Stored beam & injection |
0800-1200 |
Initial lattice setup |
Sajaev |
Stored beam & injection |
1200-1300 |
Linac training |
Frazier |
Limited injection |
1300-1600 |
Set-up RF Gun 1 files |
Pasky |
|
1300-1600 |
RF5 troubleshooting |
RF Group |
No injection |
1600-2000 |
PAR high charge studies |
Yao/Harkay |
No injection |
1600-2200 |
CPU checkout I |
Xiao |
Stored beam |
2200-2400 |
OPEN |
|
|
|
Thursday, January 23, 2014 |
|
|
0000-0400 |
OPEN |
|
|
0400-0600 |
Linac training (00-07) |
Frausto |
Limited injection |
0600-0800 |
test 1-Hz linac-PAR injection. |
Lenkszus, DiMonte, Yao. |
No injection |
0800-1100 |
BESOCM Trigger validations |
Pasky/Pietryla |
No Injection |
0800-1100 |
Investigate suspect RF cavity IR detectors |
RF Group |
Zone F access |
0800-1100 |
Working on the IEX BPLD |
Deriy |
No beam |
0800-1100 |
Waveguide switch to RF3&RF4 |
RF Group |
No beam |
0800-1100 |
Booster ramp current regulation test |
Yao/Shang |
No Injection |
1100-1300 |
Booster extraction area radiation survey with HP with beam steering |
Yao/Vacca |
Limited injection |
1300-1500 |
Injector training (07-15) |
Angel |
Limited Injection |
1500-2100 |
Intermediate BPM checkout |
Sereno |
Stored beam & injection |
2100-2400 |
OPEN |
|
|
|
Friday, January 24, 2014 |
|
|
0000-0400 |
OPEN |
|
|
0400-0600 |
Linac training (00-07) |
Frausto |
Limited Injection |
0600-1200 |
Investigate diag. in PAR & PTB for high charge (Fill SR with 324 singlets before this study starts) |
Keane/Lill/ Pasky |
Limited injection |
0730-1000 |
Set-up visible light pinhole (324 singles) |
B. Yang/Emery |
Stored beam & occ. injection |
1200-1800 |
100mA 324, IEX checkup |
Xiao/Deriy |
Stored beam |
1800-2400 |
Try on-resonance beam size measurements |
Sajaev + others |
Stored beam & injection |
|
Saturday, January 25, 2014 |
|
|
0000-0700 |
OPEN |
|
|
0700-0900 |
Injector training (07-19) |
Angel |
Limited Injection |
0900-1200 |
Set-up RF Gun 1 files |
Pasky/Dooling/ Yin-E Sun |
Limited injection |
1200-1700 |
OPEN |
|
|
1700-2300 |
CPU checkout #2 |
Xiao |
Stored beam |
2300-2400 |
OPEN |
|
|
|
Sunday, January 26, 2014 |
|
|
0000-0800 |
OPEN |
|
|
0800-1000 |
Injector training (07-19) |
Angel |
Limited Injection |
1000-1800 |
Top-up checkout |
OPS |
Stored beam& injction |
1200-1700 |
Set-up visible light pinhole (parasitic to top-up checkout) |
B. Yang |
Stored beam &injection |
1800-2400 |
100mA, 324 IEX checkout #2 |
Xiao |
Stored beam |
|
Monday, January 27, 2014 |
|
|
0000-0700 |
OPEN |
|
|
0700-0900 |
Injector training (07-15) |
Angel |
Limited Injection |
0800-1000 |
Waveguide switch to RF3 and check for operational readiness |
RF group |
No beam |
1000-1200 |
Final pinhole camera setup & bunch purity setup |
Yang |
Stored beam & injection |
1200-1800 |
Final BPM checkout |
Sereno |
Stored beam & injection |
1800-2200 |
Final lattice setup |
Sajaev |
Stored beam & injection |
2200-2400 |
SCU0 skew quad feedforward checkout, 100 mA, 24 bunches |
Harkay/Emery |
Stored beam & injection |
|
Tuesday, January 28, 2014 |
|
|
0000-0200 |
SCU0 skew quad feedforward checkout, 100 mA, 24 bunches |
Harkay/Emery |
Stored beam & injection |
0100-0630 |
OPEN |
|
|
0630-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |