April 1st 0800 – April 2nd 0800



Time

Descriptions

Studiers

SR Status


Tuesday, April 01, 2014



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0800-0810

Observe (BM shutter behavior

Forrestal

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1000

Reboot interleaving PS DSPs

PS Group

No Injection

0930-1130

Investigate sector 4 cabinet 5 Gespac.

Puttkammer

No beam

0930-1130

Replace DAC/Regulator and +5V control power pak for PTB:Q7

Puttkammer

No beam

0930-1130

Replace Gespac power supply in sector 37 cabinet 1

Putkammer

No beam

0930-1000

Remove and replace MPC for ion pump VM:05:2IP6ID1

Martens

No Beam

0930-1000

Waveguide switch to RF-3

RF Group

No Beam

0930-1130

Swap quadrupoles in S2

Puttkammer

No Beam

1000-1130

Check out RF-3 and close CCWP

RF Group

No Beam

1000-1200

Investigate erratic cavity phase readback on the Harmonic PAR system

RF Group

No Beam

1000-1200

PC gun measurements

Pasky/Grabinski

Access Linac

1200-1230

Recover stored beam and take orbit response measurement, measure tunes

OPS/Schroeder

Stored beam & injection

1230-1400

SR training (09-15)

Obasohan

Stored Beam & Injection

1400-1600

RG2 studies

Pasky

Limited injection

1600-1900

booster BM new ramp tuning with beam

Yao

Limited injection

1900-2100

verify/correct RHB lattice functions

Sajaev

Stored Beam & injection

2100-2400

Work on script for turn-by-turn data collection during user operation

Sajaev

Stored Beam & injection


Wednesday, April 02, 2014



0000-0100

Work on script for turn-by-turn data collection during user operation(continued)

Sajaev

Stored Beam & injection

0100-0500

Study tune shift with amplitude vs chromaticity

Sajaev

Stored Beam & injection

0500-0700

Linac training (23-07)

Frausto

Limited Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection