April 8th 0800 – April 9th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, April 8, 2014



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables; take orbit response measurement & tunes

Schroeder

Stored Beam & Injection

0930-1000

Waveguide switch from RF-2 to RF-3

RF Group

No Beam

0930-1130

Test upgrade of iocs1bpm & iocbpmdp

Xu

No Beam

0930-1130

Swap old quad PS and thermal scan zone B PS

PS Group

No Beam

0930-1130

Restore PAR RF-12 tuner phase offsets

Goel

No Injection

1000-1100

Replace failed blower in IK4

Morrison

Access Zone F

1130-1200

Recover beam, store 24 singlets, take orbit response measurement and tunes

OPS/Schroeder

Stored beam & inj.

1200-1400

Linac console test (09-15)

Frausto

Limited Injection

1400-1500

Booster/SR training (09-15) Can use SR stored beam 13:00-14:00

Angel

Stored Beam & Injection

1500-1800

booster BM new ramp software test.

Yao/Shang

Limited Injection

1730-1800

Remove admin LOTO for IK5 turn on and kicker warmup complete for next study (zero setpoint)

OPS

No impact

1800-2100

measure beam loss in ID6 with MPS dumps (24 singlets) (IK5 admin LOTO after study complete)

Dooling/Harkay

Stored beam & inj.

2100-2300

Storage Ring training (15-23)

Obasohan

Stored Beam & Injection

2300-2400

prepare start up lattice

Xiao

Stored Beam & Inj.


Wednesday, April 9, 2014



0000-0500

prepare start up lattice (continued)

Xiao

Stored Beam & Inj.

0500-0700

OPEN



0700-0800

Prepare for User beam

OPS

Stored Beam & Injection