Machine Studies

Schedule for Run01-12, 2014

April 15th 0800 – April 16th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, April 15, 2014



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables, take orbit response measurement, tunes

Schroeder

Stored Beam & Injection

0930-1030

Bldg. 450 reconfigure bus-tie

Kailus

No beam

0930-1030

Bus-tie B:BM power supplies

Yao/Wang/FMS

No Injeciton

0930-1130

Swap out S17A:S1 converter converter supplies

Puttkammer

No Beam

0930-1130

Troubleshoot BTS:AV1

PS
Group

No Beam

0930-1230

Investigate PAR RF-12 phase detector

(Fill storage-ring with 24 singlets before next study) (deferred)

RF Group

Limited Injection

1230-1330

Take tunes and orbit response measurement (canceled)

Schroeder

Stored beam

1230-1430

setup the booster beam after switching the booster to bus-tie on the experiment side of AC line

Yao/Shang/ J. Wang

Limited Injection

1430-1630

test VSA/MXA based SR tune and chromaticity application

Yao/Shang

Stored beam

1500-1700

PAR training (15-23)

Frausto

Limited Injection

1700-2100

measure dynamic aperture as a function of orbit in ID4

Sajaev

Stored beam & inj.

2100-2400

Orbit switch to 324

Xiao

Stored beam & inj.


Wednesday, April 16, 2014



0000-0100

Orbit switch to 324 (continued)

Xiao

Stored beam & inj.

0100-0300

Orbit switch for next start-up

Xiao

Stored beam & inj.

0300-0500

OPEN



0500-0700

SR training (23-07)

Angel

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection