Machine Studies

Draft Schedule for Run01-2, 2014

February 4th 0800 - February 5th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, February 04, 2014



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1000

7BM end to end test

Budz

No Beam

0930-1030

Swapout P0 amplifiers

Keane

No Beam

0930-1100

Reboot FPGA based BPMs

Pietryla

No Beam

0930-1130

Install blanking plate for RF test stand

RF Group

All 352Mhz systems off

0930-1130

Troubleshoot RF IOC problems

DiMonte

No Beam

0930-1130

Troubleshoot Linac quad PS

Hillman

No Injection

1000-1100

Swap out S11B:V4

Puttkammer

No Beam

1000-1100

Measure 10ID vacuum chamber

Erwin

Access Zone B

1000-1100

Load BPLD limits

OPS

No impact

1100-1130

RF system waveguide switch

RF Group

No Beam

1100-1200

Investigate and repair 19VV02 MPS fault. Switch will be replaced

Gagliano

Access Zone C

1100-1230

Checkout ITS interlocks/ verify ioc consoles

Pietryla

Limited Injection

1130-1330

Troubleshoot RF4 modAnode current readback

Trento

No beam

1130-1330

test new current ramp program, no booster beam.

Yao, Shang

No injection

1230-1330

Switch to PAR Fundamental #2 (has been repaired) and verify beam

OPS

No injection

1330-1530

check and calibrate PAR current monitor output voltage. Will run high charge beam in the PAR during test

Yao, Keane

No injection

1530-1900

Investigate, repair and validate BPLD at BPM S25AP1

Sereno, Lill, Bui, Sun

Stored beam & injection

1900-2100

Linac training (15-23)

Frausto

Limited Injection

2100-2400

check IEX PS and control issues

Xiao, Deriy, Smith

Stored beam & injection


Wednesday, February 05, 2014



0000-0100

check IEX PS and control issues (continued)

Xiao, Deriy, Smith

Stored beam & injection

0100-0500

Beam dumps, vertical scrapers, ID gaps closed, 24 bunches, 20-100 mA, SCU0 off

Harkay, Dooling, Xiao

Stored beam & injection

0500-0700

Booster training (23-07)

Angel

Limited Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection