Machine Studies

Draft Schedule for Run01-4, 2014

February 18th 0800 - February 19th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, February 18, 2014



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam &Injection

0930-1130

Test Booster ramp correction

Yao/Shang

Limited Injection

0930-1130

Re-install and test PAR RF-1 amplifier

RF Group

Limited Injection

0930-1130

L1,2 & 3 klystron emission studies

Cours

No Injection

0930-10:30

Replace S5A:V3 P.S.

Puttkammer

No beam

1000-1100

Investigate odd RF turn-off signature seen on RF2's modulator module beam-dump scope trace

Berenc

No beam

1000-1100

Tune PID loops at S37

Erwin/FMS

No Beam

1000-1200

Survey 35ID vacuum chamber

Erwin/S&A

Access Zone F

1000-1200

Replace probe at Zone A/F gate

Vacca

Access Zone F

1200-1300

measure and setup new injection tune controllaw with the new I-Ramp configuration.

Yao

No injection

1300-1400

Standardize quads to determine what happened to the tunes

Emery

Stored beam, Occ. inj.

1300-1500

Linac training (07-15)

Frausto

Limited Injection

1500-1900

IEX studies

Xiao/Deriy/ Smith, M.

Stored beam & injection

1900-2100

Booster training (15-23)

Angel

Limited injection

2100-2300

test 4 corrector/bpm bump for RTFB hardware test. Take more 12 second and 1 second FPGA bpm data sets.

Sereno/Emery

Stored beam & injection

2300-2400

Restore S5A:V3 and RTFB matrix back to operating values

Emery

Stored beam & injection


Wednesday, February 19, 2014



0000-0100

check the limits/margin in setting Kp for RTFB loop

Emery

Stored beam & injection

0100-0300

SR training (23-07)

Obasohan

Stored Beam & Injection

0300-0700

Set up hybrid lattice

Sajaev

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection