Machine Studies
Draft Schedule for Run01-8, 2014
March 18th 0800 – March 19th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, March 18, 2014 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables; take orbit response measurement & tunes |
Schroeder |
Stored Beam & Injection |
0930-1000 |
Reboot interleaving PS DSPs |
PS Group |
No Injection |
0930-1000 |
Shutdown AHU for S37 & 38 |
Erwin/FMS |
No Beam |
0930-1130 |
Scope +5V supplies in Zone A |
Puttkmammer |
No Beam |
0930-1130 |
Switch to RF3 and sniff klystron output |
RF Group |
No Beam |
0930-1315 |
Test new tuner amplifier for PAR RF-12 |
RF Group |
Limited Injection |
1000-1300 |
Vibration measurements |
Preissner |
Access Zone A |
1130-1230 |
SR Cavity vector sum monitoring |
RF Group |
No Beam Booster & SR RF up |
1330-1345 |
Take orbit response measurement and tunes with 324 singlets |
Schroeder |
Stored beam |
1345-1500 |
Storage Ring training (09-15) |
Obasohan |
Stored Beam & Injection |
1500-1600 |
test the upgrade of iocsbpmdp with beam |
S. Xu |
Stored Beam & Injection |
1600-1800 |
prepare and run booster new ramp correction during study. |
Yao/Shang |
Limited injection |
1800-2200 |
SCU0 BLM studies |
Harkay/Dooling |
Stored beam & injection |
2200-2400 |
beam lifetime measurement vs rf acceptance |
Xiao |
Stored beam & injection |
|
Wednesday, March 19, 2014 |
|
|
0000-0400 |
beam lifetime measurement vs rf acceptance (continued) |
Xiao |
Stored beam & injection |
0400-0700 |
investigate on-axis injection with coupling resonance |
Emery |
Stored beam & inj. |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |