Machine Studies

Draft Schedule for Run01-8, 2014

March 18th 0800 – March 19th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, March 18, 2014



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables; take orbit response measurement & tunes

Schroeder

Stored Beam & Injection

0930-1000

Reboot interleaving PS DSPs

PS Group

No Injection

0930-1000

Shutdown AHU for S37 & 38

Erwin/FMS

No Beam

0930-1130

Scope +5V supplies in Zone A

Puttkmammer

No Beam

0930-1130

Switch to RF3 and sniff klystron output

RF Group

No Beam

0930-1315

Test new tuner amplifier for PAR RF-12

RF Group

Limited Injection

1000-1300

Vibration measurements

Preissner

Access Zone A

1130-1230

SR Cavity vector sum monitoring

RF Group

No Beam Booster & SR RF up

1330-1345

Take orbit response measurement and tunes with 324 singlets

Schroeder

Stored beam

1345-1500

Storage Ring training (09-15)

Obasohan

Stored Beam & Injection

1500-1600

test the upgrade of iocsbpmdp

with beam

S. Xu

Stored Beam & Injection

1600-1800

prepare and run booster new ramp correction during study.

Yao/Shang

Limited injection

1800-2200

SCU0 BLM studies

Harkay/Dooling

Stored beam & injection

2200-2400

beam lifetime measurement vs rf acceptance

Xiao

Stored beam & injection


Wednesday, March 19, 2014



0000-0400

beam lifetime measurement vs rf acceptance (continued)

Xiao

Stored beam & injection

0400-0700

investigate  on-axis injection with coupling resonance

Emery

Stored beam & inj.

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection