Machine Studies
Draft Schedule for Run01-9, 2014
March 24th 0800 – March 26th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 24, 2014 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1000 |
Waveguide switch from RF2 to RF3 |
RF Group |
No Beam |
0930-1000 |
Measure the timing on a scope of the MPS and IK5 pinger triggers. The pinger will remain off and locked out |
Harkay, Dooling |
No beam |
0930-1030 |
Check wavetek timing generator card at PAR RF12 |
RF Group |
Limited Injection |
0930-1130 |
Swap old quadrupole PS |
Puttkammer |
No Beam |
0930-1130 |
Scope +5V supplies in Zone C |
Puttkammer |
No Beam |
0930-1130 |
Test PAR RF12 tuner amplifier |
RF Group |
Limited Injection |
0930-1330 |
L4 RF timing measurements |
RF Group |
Limited Injection |
1000-1100 |
Test S1BPM upgrade without beam |
S. Xu |
No beam |
1000-1100 |
Check thermocouple locations at S35 DCCT bellows |
Erwin/Hoyt |
Access Zone F |
1100-1300 |
Checkout of RF-3 |
RF Group |
No Beam |
1100-1300 |
Investigate Bitbus errors or timeouts occurring in Sector 36 & 37 (can start earlier if power to raws/converters not needed) |
Puttkammer |
No Beam |
1300-1330 |
Recover and store 324 singlets |
OPS |
Stored beam & injection |
1330-1400 |
Take tunes and orbit response measurement |
Schroeder |
Stored beam |
1330-1500 |
Linac training (07-15) |
Frausto |
Limited Injection |
1500-1700 |
Booster training (15-23) |
Angel |
Limited Injection |
1500-1700 |
Measure x and x' closed bump with stored beam |
Emery |
Stored beam |
1700-2100 |
injection while in coupling resonance |
Emery |
Stored beam & inj. |
2100-2400 |
RHB Lattice Set-up |
Xiao |
Stored beam & inj. |
|
Tuesday, March 25, 2014 |
|
|
0000-0100 |
RHB Lattice Set-up (continued |
Xiao |
Stored beam & inj. |
0100-0500 |
Orbit Switch |
Xiao |
Stored beam & inj. |
0500-0700 |
SR training (23-07) |
Obasohan |
Stored Beam & Injection |
0700-1000 |
X-ray BPM alignment with beam |
Hahne |
Stored Beam & injection |
1000-1200 |
Datapool ioc epics upgrade studies |
S. Xu, Schroeder |
Stored Beam |
1000-1200 |
Test new SR tune measurement |
Yao |
Stored Beam |
1000-1200 |
Linac training (07-15) |
Frausto |
Limited Injection |
1200-1600 |
revisit injection limit as a function of vertical oscillation (pinger may be needed) |
Emery |
Stored beam & injection |
1600-2000 |
datapool stability characterization with Gain or time interval. |
Emery |
Stored beam & injection |
2000-2200 |
SR training (15-23) |
Angel |
Stored Beam & Inj. |
2200-2400 |
beam lifetime measurement |
Xiao |
Stored Beam & injection |
|
Wednesday, March 26, 2014 |
|
|
0000-0400 |
beam lifetime measurement |
Xiao |
Stored Beam & injection |
0400-0600 |
SR training (23-07) |
Obasohan |
Stored Beam & Injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |