Machine Studies

Draft Schedule for Run02-10, 2014

July 29th 0800 – July 30th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, July 29, 2014



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables & orbit response measurement

Schroeder

Stored Beam & Injection

0930-1130

Install and test xray blade amp PV in iocs27fb

Lenkszus

No Beam

0930-1130

Trace out Linac timing fibers

Pietryla

Limited Injection

0930-1130

Repair cap. Temp readbacks on converters

Jordan

No Beam

0930-1130

Troubleshoot IK5 for overvoltage


Wang

No Beam

0930-1130

Swap out old quad converters

Vargas

No Beam

0930-1130

Test P0 / 44MHz optical signal levels to iocs3bpm and iocs5bpm

Laird

No beam

0930-1230

Investigate GESPAC in S38

Puttkammer

No beam

0930-1230

RF-3 cathode emission test

RF Group

No Beam

0930-1230

Install and calibrate beam I sensor in RF4

RF Group

No Beam

1000-1100

Pump work on pumps 511 & 513 (S15-16)

Wright

No Beam

1130-1230

Linac training (07-15)

Henry

Limited Injection

1230-1300

SR recovery

OPS

Stored Beam & Injection

1300-1400

Orbit response measurement

Schroeder

Limited Injection

1400-1800

Test Injection Kicker Configuration vs SCU0 BLM Signals

Harkay/Dooling

Stored Beam & Injection

1800-1900

Booster chromaticity measurement

Yao

No Beam

1900-2100

booster high charge study

Yao

No Beam

2100-2300

SR training (15-23)

Obasohan

Stored Beam & Injection

2300-2400

SCU0 impedance measurement

Xiao

Stored Beam & Injection


Wednesday, July 30, 2014



0000-0500

SCU0 impedance measurement (continued)

Xiao

Stored Beam & Injection

0500-0700

PAR training

Frausto

Limited injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection