Machine Studies
Draft Schedule for Run02-10, 2014
July 29th 0800 – July 30th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, July 29, 2014 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables & orbit response measurement |
Schroeder |
Stored Beam & Injection |
0930-1130 |
Install and test xray blade amp PV in iocs27fb |
Lenkszus |
No Beam |
0930-1130 |
Trace out Linac timing fibers |
Pietryla |
Limited Injection |
0930-1130 |
Repair cap. Temp readbacks on converters |
Jordan |
No Beam |
0930-1130 |
Troubleshoot IK5 for overvoltage
|
Wang |
No Beam |
0930-1130 |
Swap out old quad converters |
Vargas |
No Beam |
0930-1130 |
Test P0 / 44MHz optical signal levels to iocs3bpm and iocs5bpm |
Laird |
No beam |
0930-1230 |
Investigate GESPAC in S38 |
Puttkammer |
No beam |
0930-1230 |
RF-3 cathode emission test |
RF Group |
No Beam |
0930-1230 |
Install and calibrate beam I sensor in RF4 |
RF Group |
No Beam |
1000-1100 |
Pump work on pumps 511 & 513 (S15-16) |
Wright |
No Beam |
1130-1230 |
Linac training (07-15) |
Henry |
Limited Injection |
1230-1300 |
SR recovery |
OPS |
Stored Beam & Injection |
1300-1400 |
Orbit response measurement |
Schroeder |
Limited Injection |
1400-1800 |
Test Injection Kicker Configuration vs SCU0 BLM Signals |
Harkay/Dooling |
Stored Beam & Injection |
1800-1900 |
Booster chromaticity measurement |
Yao |
No Beam |
1900-2100 |
booster high charge study |
Yao |
No Beam |
2100-2300 |
SR training (15-23) |
Obasohan |
Stored Beam & Injection |
2300-2400 |
SCU0 impedance measurement |
Xiao |
Stored Beam & Injection |
|
Wednesday, July 30, 2014 |
|
|
0000-0500 |
SCU0 impedance measurement (continued) |
Xiao |
Stored Beam & Injection |
0500-0700 |
PAR training |
Frausto |
Limited injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |