Aug5th 0800 -- Aug6th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, Aug 5, 2014 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables & orbit response measurement |
Schroeder |
Stored Beam & Injection |
0830-1130 |
use the PAR Bypass Quadrupole slots to test the PS control cards for the new EMI supply in the ITS |
Donkers |
No impact |
0930-1200 |
Repair the Cap temp read-backs on converters |
Jordan |
No beam |
0930-1200 |
Continue swap-out of old Quad converters in Zone A |
Vargas |
No beam |
0930-1130 |
Investigate/repair cause of FPGA P0 sync errors in S1 through 6 (iocmtime may be rebooted/power cycled) |
Pietryla/Laird |
No beam |
0930-1200 |
Troubleshoot IK5 for overvoltage issues |
J. Wang |
No beam |
0930-1200 |
Troubleshoot IEX PS |
Deriy/Smith |
No beam |
0930-1030 |
Measure BESOCM output as a function of Linac charge |
Sereno |
Linac beam |
1030-1200 |
Troubleshoot booster chromaticity measurement configuration |
Yao/Shang |
Booster beam |
1000-1200 |
Installation of scintillation material at 10-ID |
Erwin |
Access Zone B |
1200-1230 |
Recover SR |
OPS |
Stored beam & injection |
1230-1300 |
Take orbit response measurement |
Schroeder |
Stored beam |
1300-1600 |
X BPM alignment and gap scans |
Sereno |
Stored beam & injection |
1600-2000 |
Unified feedback studies |
Sereno/Carwardine |
Stored beam & injection |
2000-2300 |
S27 GRID XBPM steering studies |
Sereno/Yang |
Stored beam & injection |
2300-2400 |
Test Injection kicker configurations vs SCU0 BLM signals |
Harkay/Dooling |
Stored beam & injection |
|
Wednesday, Aug 6, 2014 |
|
|
0000-0300 |
Test Injection kicker configurations vs SCU0 BLM signals |
Harkay/Dooling |
Stored beam & injection |
0300-0700 |
Local impedance measurement |
A. Xiao |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |