Machine Studies

Draft Schedule for Run02-12, 2014

August 12th  0800 – August 13th   0800

 

Time

Descriptions

Studiers

SR Status

 

Tuesday, August 12, 2014

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1000

Switchover pump 509

Wright

No Beam

0930-1030

Waveguide switch to RF3

RF Group

No Beam

0930-1030

Troubleshoot event receiver at iocs29bpm

Laird

No Beam

0930-1130

Troubleshoot IK5 pinger

Wang

No Beam

0930-1130

IEX PS test

Deriy/Smith

No Beam

0930-1130

Booster ramp bump scan script test

Yao/Shang

Booster Beam

1130-1200

Storage ring recovery (to 324)

OPS/Xiao

Stored Beam & Injection

1200-1300

Verification of IEX PS work

Smith/Xiao

Stored Beam & Injection

1300-1400

Investigate and re-time S9A BSP-100 BPMs

Sereno

Stored Beam & Injection

1400-1700

XBPM alignment and gap scans

Sereno

Stored Beam & Injection

1700-2000

Unified feedback study

Sereno

Stored Beam & Injection

2000-2200

S27 grid XBPM study

Sereno

Stored Beam & Injection

2200-2400

SCU0 BLM study

Harkay/Dooling

Stored Beam & Injection

2200-2400

Study S10 transverse loss monitor

Dooling/Berg

Stored Beam & Injection

 

Wednesday, August 13, 2014

 

 

0000-0100

SCU0 BLM study

Harkay/Dooling

Stored Beam & Injection

0100-0600

Setup 324 and Orbit Switch

Xiao

Stored Beam & Injection

0600-0700

Calibration of topup signal

Xiao

Stored Beam & Injectio

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection